IH RAMP LIN MEM DR over LAND

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:IH RAMP LIN MEM DR over LAND
Structure number:B400400005E0000
Location:1.2M E JCT IH 94 TO E
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:65.0 ft. [19.8 m]
Total length:302.5 ft. [92.2 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Owner:State Highway Agency [01]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,500 [as of 2006]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:46.3 tons [42.1 metric tons]
Inventory rating:37.4 tons [34.0 metric tons]
Sufficiency rating:94.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,600 [as of 1984]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:46.3 tons [42.1 metric tons]
Inventory rating:37.4 tons [34.0 metric tons]
Sufficiency rating:95.1

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,600 [as of 1984]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:46.5 tons [42.3 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:95.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]