Share:

LRD N 16TH ST over IH 94 E-W FREEWAY

Map 

Coordinates:
+43.03563, -87.93295
43°02'08" N, 87°55'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LRD N 16TH ST over IH 94 E-W FREEWAY
Structure number:B40055000180000
Location:0.8M N JCT STH 59
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:108.6 ft. [33.1 m]
Total length:276.9 ft. [84.4 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:72.5 ft. [22.1 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1929
Year reconstructed:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,700 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:87.3 tons [79.4 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,891,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,700 [as of 1984]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.6 tons [55.1 metric tons]
Inventory rating:39.2 tons [35.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:61.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$15,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,700 [as of 1984]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:66.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$15,000