Facts 

Name:USH 51 over MANITOWISH RIVER
Structure number:B63000300000000
Location:1.2M N JCT CTH W
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:69.9 ft. [21.3 m]
Total length:185.7 ft. [56.6 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,088 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:57.0 tons [51.8 metric tons]
Inventory rating:33.9 tons [30.8 metric tons]
Sufficiency rating:77.9

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1993]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:57.0 tons [51.8 metric tons]
Inventory rating:33.9 tons [30.8 metric tons]
Sufficiency rating:78.4

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,950 [as of 1988]
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:67.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$323,000