Share:

LRD WHITNALL PARK over BR ROOT RIVER

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LRD WHITNALL PARK over BR ROOT RIVER
Structure number:P40071300000000
Location:1.1M E JCT USH 45
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:23.0 ft. [7.0 m]
Total length:24.6 ft. [7.5 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:41.7 ft. [12.7 m]
Owner:County Highway Agency [02]
Year built:1934
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:175 [as of 2007]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:19.6 tons [17.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:35.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$170,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:175 [as of 1977]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:19.6 tons [17.8 metric tons]
Sufficiency rating:75.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:175 [as of 1977]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Sufficiency rating:77.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$3,000