LRD W BROWN ST over CANADIAN PACIFIC RR
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | LRD W BROWN ST over CANADIAN PACIFIC RR |
| Structure number: | P40085900000000 |
| Location: | 0.7M W JCT STH 57 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 33.1 ft. [10.1 m] |
| Total length: | 96.5 ft. [29.4 m] |
| Roadway width between curbs: | 36.1 ft. [11.0 m] |
| Deck width edge-to-edge: | 59.1 ft. [18.0 m] |
| Vertical clearance below bridge: | 23.6 ft. [7.2 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1934 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,500 [as of 2007] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 55.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $723,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,500 [as of 1977] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 55.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $207,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,500 [as of 1977] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 87.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $207,000 |