Share:

GRANT ST over NS RAILROAD

Map 

Coordinates:
+37.27239, -81.21743
37°16'21" N, 81°13'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GRANT ST over NS RAILROAD
Structure number:00000000028A906
Location:0.02 MI N OF US 19
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:142.1 ft. [43.3 m]
Total length:319.9 ft. [97.5 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:21.3 ft. [6.5 m]
Vertical clearance above deck:13.5 ft. [4.1 m]
Vertical clearance below bridge:24.6 ft. [7.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1941
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Truss - Thru [10]
Deck type:Open Grating [3]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:750 [as of 2006]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:14.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,500,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:750 [as of 1994]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:46.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$225,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:750 [as of 1988]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:16.8 tons [15.3 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Structurally deficient [1]