Share:

CR 5 over BIG BEAVER CREEK

Map 

Coordinates:
+38.32844, -80.66506
38°19'42" N, 80°39'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CR 5 over BIG BEAVER CREEK
Structure number:00000000034A012
Location:0.03 MI W OF CR 94/1
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:36.1 ft. [11.0 m]
Total length:92.9 ft. [28.3 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:17.7 ft. [5.4 m]
Owner:State Highway Agency [01]
Year built:1918
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:400 [as of 2006]
Truck traffic:5% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,118,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:500 [as of 1997]
Truck traffic:9% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,118,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:32.7 tons [29.7 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Sufficiency rating:48.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$961,000