| Carries | Crosses | Location | Design | Status | Year Built | Year Recon | Span Length | Total Length | SR | SD/FO | ID | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| NBI report | C & O RAILROAD | AVE (U) C&O RAILROAD | 620 FT E/KENNY ROAD | Steel Girder and floorbeam system | -- | -- | -- | 46.9 | 99.1 | 0.0 | -- | 2561166 |
| NBI report | WOODY HAYES DRIVE | OLENTANGY RIVER | OVER OLENTANGY RIVER | Prestressed Girder and floorbeam system | -- | -- | -- | 142.1 | 425.9 | 79.0 | -- | 2590050 |
| NBI report | WOODY HAYES DRIVE | OLENTANGY RIVER RD | OVER OLENTANGY RIVER RD | Prestressed Box beam or girders - Multiple (2 spans) | -- | -- | -- | 59.1 | 119.1 | 78.4 | -- | 2590034 |
| NBI report | MAIN ST | ALUM CREEK (MAIN STREET) | 0.1 MI E.OF ALUM CREEK DR | Steel Stringer/Multi-beam or girder (2 spans) | -- | -- | 1988 | 73.2 | 151.9 | 75.8 | FO | 2534517 |
| NBI report | CLIFTON AVE | ALUM CREEK (CLIFTON AVE) | 0.1 MI EAST OF NELSON RD | Prestressed Box beam or girders - Multiple (2 spans) | -- | -- | 2007 | 76.1 | 155.8 | 90.3 | -- | 2532557 |
| NBI report | GREENLAWN AVE | RENNICK DI (GREENLAWN) | 0.4 MI WEST OF HARMON AVE | Masonry Culvert | -- | -- | -- | 22.0 | 25.9 | 87.0 | -- | 2533421 |
| NBI report | DODRIDGE ST | OLENTANGY RIVER(DODRIDGE | 0.35 MI E.OF OLENT.RIV.RD | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1901 | 1967 | 108.9 | 208.0 | 46.1 | SD | 2531631 |
| NBI report | CONRAIL RAILROAD | R AVE (U) CONRAIL | 750 FT N/BROAD STREET | Steel Box beam or girders - Multiple | -- | 1909 | -- | 27.9 | 53.2 | 0.0 | -- | 2562820 |
| NBI report Bridgehunter | CONRAIL RAILROAD | CONRAIL RR S/MCKINLEY AV | (U) CONRAIL RR S/MCKINLEY | Concrete Arch - Deck | -- | 1909 | -- | 25.9 | 32.2 | 0.0 | -- | 2562332 |
| NBI report | B&O RR (CSX) | UNDER CSX RR (OLD B&O) | 0.06 MI S OF SR70 | Steel Girder and floorbeam system | -- | 1910 | -- | 29.9 | 57.1 | 0.0 | -- | 2503123 |
| NBI report | CSX RR | UNDER CSX RR | 1.99 MI N OF SR70 | Steel Girder and floorbeam system | -- | 1910 | -- | 36.1 | 61.0 | 0.0 | -- | 2503182 |
| NBI report | CSX RR | UNDER CSX RR | 0.44 MI E OF SR315 | Steel Girder and floorbeam system | -- | 1910 | -- | 58.1 | 96.1 | 0.0 | -- | 2503662 |
| NBI report | GROVEPORT ROAD | C&O RR N/WILLIAMS ROAD | .4 MI N/WILLIAMS ROAD | Prestressed Box beam or girders - Multiple | -- | 1910 | 1993 | 84.0 | 86.9 | 76.1 | FO | 2560224 |
| NBI report | CONRAIL RAILROAD | CONRAIL S/MCKINLEY | 475 FT S/MCKINLEY AVENUE | Steel Stringer/Multi-beam or girder | -- | 1910 | -- | 34.1 | 56.1 | 0.0 | -- | 2561417 |
| NBI report | B&O RR (CSX) | UNDER CSX RR (OLD B&O) | 0.82 MI N OF SR70 | Steel Girder and floorbeam system | -- | 1911 | -- | 36.1 | 60.0 | 0.0 | -- | 2503158 |
| NBI report | RR | UNDER CSX RR | 0.51 MI W OF N FOURTH ST | Steel Girder and floorbeam system | -- | 1911 | -- | 44.9 | 89.9 | 0.0 | -- | 2502313 |
| NBI report | PARSONS AVENUE | CONRAIL S/HOSACK | 350 FT S/HOSACK STREET | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1915 | 1948 | 46.9 | 226.1 | 73.3 | FO | 2561018 |
| NBI report | US 23 | OVER CONV CTR CONN & NSR | 0.53 MI N OF US40 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1915 | 1965 | 84.0 | 536.1 | 56.7 | SD | 2500663 |
| NBI report | NS RAILROAD | LE ROAD (U) NS RAILROAD | 70 FT E/FLINT ROAD | Prestressed Stringer/Multi-beam or girder | -- | 1916 | -- | 22.0 | 43.0 | 0.0 | -- | 2561646 |
| NBI report Bridgehunter | SUMMITT AVE. | SUMMITT OVER IUKA AVE | 1.87 MI S. OF IR670 | Concrete Arch - Deck | NR listed | 1916 | 2002 | 49.9 | 60.4 | 93.1 | -- | 2500930 |
| NBI report | CSXT RAILROAD | LE ROAD (U) CSXT RAILROA | 73 FT E/FLINT ROAD | Steel Stringer/Multi-beam or girder | -- | 1916 | -- | 22.0 | 43.0 | 0.0 | -- | 2561778 |
| NBI report | CONRAIL RAILROAD | CONRAIL W/CLEVELAND | .25 MI W/CLEVELAND AVENUE | Steel Girder and floorbeam system | -- | 1917 | -- | 32.2 | 67.9 | 0.0 | -- | 2562499 |
| NBI report | CONRAIL RAILROAD | CONRAIL #1 E/FOURTH | 750 FT E/FOURTH STRET | Steel Girder and floorbeam system | -- | 1917 | -- | 32.2 | 63.0 | 0.0 | -- | 2562545 |
| NBI report | CONRAIL RAILROAD | CONRAIL W/CLEVELAND | .28 MI W/CLEVELAND AVENUE | Steel Girder and floorbeam system | -- | 1917 | -- | 40.0 | 66.9 | 0.0 | -- | 2560941 |
| NBI report | CONRAIL RAILROAD | CONRAIL #1 E/FOURTH | .2 MI E/FOURTH STREET | Steel Girder and floorbeam system | -- | 1917 | -- | 39.0 | 64.0 | 0.0 | -- | 2562804 |
| NBI report | CONRAIL RAILROAD | STREET (U) CONRAIL | 200 FT W/STARLING STREET | Steel Girder and floorbeam system | -- | 1920 | -- | 53.2 | 81.0 | 0.0 | -- | 2563045 |
| NBI report | US 62D | PLANT DRIVE(ABAND.CSX RR | 0.41 MI E OF SR315 | Steel Stringer/Multi-beam or girder | -- | 1920 | -- | 21.0 | 49.9 | 0.0 | -- | 2503603 |
| NBI report | CONRAIL RAILROAD | CONRAIL W/STARLING | 250 FT W/STARLING STREET | Concrete Arch - Deck | -- | 1920 | -- | 25.9 | 29.9 | 0.0 | -- | 2562448 |
| NBI report | CSX RAILROAD | STREET (U) CSX RAILROAD | 250 FT W/STARLING STREET | Steel Girder and floorbeam system | -- | 1920 | -- | 53.2 | 81.0 | 0.0 | -- | 2562995 |
| NBI report Bridgehunter | US 23 | GLEN ECHO | 3.22 MI N OF IR670 | Concrete Arch - Deck | NR listed | 1921 | -- | 40.0 | 59.1 | 74.3 | FO | 2500698 |
| NBI report | ARCADIA AVENUE | OVER GLEN ECHO RAVINE | 300 FT E/INDIANOLA AVENUE | Steel Stringer/Multi-beam or girder | -- | 1922 | 1969 | 37.1 | 41.0 | 63.6 | FO | 2560062 |
| NBI report | GLICK ROAD | OSHAUGNESSY DAM W/USRT 3 | 670 FT W/SR 257 | Prestressed Box beam or girders - Multiple (13 spans) | -- | 1924 | 1991 | 70.9 | 1005.0 | 92.3 | -- | 2564009 |
| NBI report Bridgehunter | CALUMET STREET | OVER GLEN ECHO RAVINE | 725 FT N/ARCADIA AVENUE | Concrete Arch - Deck | -- | 1924 | 1975 | 82.0 | 191.0 | 82.6 | -- | 2561883 |
| NBI report | NS RR | UNDER NS RR | 0.10 MI. N. OF I71 | Concrete Slab | -- | 1925 | -- | 40.0 | 65.9 | 0.0 | -- | 2500124 |
| NBI report | CSX RAILROAD | CSX(495) S/SR 104 | (U) CSX(495) S/SR 104 | Steel Stringer/Multi-beam or girder | -- | 1925 | -- | 45.9 | 70.9 | 0.0 | -- | 2561956 |
| NBI report Bridgehunter | WESTWOOD DRIVE | DRY RUN E/ELDON AVE | 100 FT E/ELDON AVENUE | Concrete Arch - Deck | -- | 1926 | -- | 36.1 | 69.9 | 96.0 | -- | 2560593 |
| NBI report | CSX RAILROAD | AMS RD.(U) CSX RR. | (U) C&0 RR W/GROVEPORT RD | Steel Stringer/Multi-beam or girder | -- | 1927 | -- | 35.1 | 37.1 | 0.0 | -- | 2560097 |
| NBI report Bridgehunter | NS RAILROAD | UNDER N&W #2 E FOURTH ST | .15 MI E/FOURTH STREET | Concrete Arch - Deck | -- | 1928 | -- | 61.0 | 130.9 | 0.0 | -- | 2562618 |
| NBI report | CAMP CHASE RR | UNDER CAMP CHASE INDS RR | 1.49 MI E OF SR270 | Steel Girder and floorbeam system | -- | 1928 | -- | 52.2 | 149.9 | 0.0 | -- | 2502437 |
| NBI report | B&O RR (CSX) | UNDER CSX RR (OLD B&O) | 0.74 MI E OF SR70 | Steel Girder and floorbeam system | -- | 1928 | -- | 60.0 | 84.0 | 0.0 | -- | 2502461 |
| NBI report | NS RAILROAD | NS RR W/SUNBURY RD | 750 FT W/SUNBURY ROAD | Concrete Tee beam | -- | 1929 | -- | 42.0 | 68.9 | 0.0 | -- | 2561026 |
| NBI report | NS RAILROAD | LIN PARK SOUTH (U) NS RR | 300 FT W/NELSON ROAD | Steel Stringer/Multi-beam or girder | -- | 1929 | -- | 42.0 | 66.9 | 0.0 | -- | 2562219 |
| NBI report | CSX RR | UNDER CSX & NS RR | 0.38 MI E OF SR315 | Steel Girder and floorbeam system | -- | 1929 | -- | 60.0 | 98.1 | 0.0 | -- | 2502526 |
| NBI report | NS RAILROAD | N&W W/NELSON RD | .2 MI W/NELSON ROAD | Concrete Tee beam | -- | 1929 | -- | 48.9 | 70.9 | 0.0 | -- | 2562367 |
| NBI report | NS RAILROAD | NW W/NELSON ROAD | .36 MI W/NELSON ROAD | Concrete Tee beam | -- | 1929 | -- | 40.0 | 67.9 | 0.0 | -- | 2562421 |
| NBI report | NS RAILROAD | NW W/NELSON RD | 300 FT W/NELSON ROAD | Steel Stringer/Multi-beam or girder | -- | 1929 | -- | 44.9 | 75.1 | 0.0 | -- | 2562200 |
| NBI report | NORFOLK SOUTHERN | UNDER NS RR | 1.71 MI N OF SR 71 | Steel Stringer/Multi-beam or girder | -- | 1929 | -- | 78.1 | 87.9 | 0.0 | -- | 2502674 |
| NBI report | NORFOLK SOUTHERN | UNDER NS RR | 3.77 MI W OF IR270 | Steel Girder and floorbeam system | -- | 1929 | -- | 89.9 | 394.0 | 0.0 | -- | 2517787 |
| NBI report | CSX RR | UNDER CSX RR | 0.42 MI E OF SR 315 | Steel Girder and floorbeam system | -- | 1929 | -- | 21.0 | 49.9 | 0.0 | -- | 2503638 |
| NBI report | CONRAIL RAILROAD | CONRAIL S/ELEVENTH | 700 FT S/ELEVENTH AVENUE | Concrete Slab | -- | 1929 | -- | 38.1 | 65.0 | 0.0 | -- | 2562928 |
| NBI report | LEONARD AVENUE | RD AVE (U) NS RAILROAD | AT FIFTH AVENUE | Steel Stringer/Multi-beam or girder | -- | 1929 | -- | 38.1 | 64.0 | 0.0 | -- | 2562936 |
| NBI report | NS RAILROAD | NW #2 E/FOURTH ST | .22 MI E/FOURTH STREET | Concrete Arch - Deck | -- | 1929 | -- | 60.0 | 120.1 | 0.0 | -- | 2562855 |
| NBI report | NS RAILROAD | NS RR S/11TH AVE | 700 FT S/ELEVENTH AVENUE | Concrete Slab | -- | 1929 | -- | 33.1 | 56.1 | 0.0 | -- | 2563029 |
| NBI report Bridgehunter | NS RAILROAD | NW W/NELSON ROAD | 450 FT W/NELSON ROAD | Steel Stringer/Multi-beam or girder | -- | 1929 | -- | 41.0 | 66.9 | 0.0 | -- | 2560852 |
| NBI report | RR | UNDER NS RR | 0.21 MI W OF SR 70 | Steel Stringer/Multi-beam or girder | -- | 1929 | -- | 39.0 | 65.0 | 0.0 | -- | 2501600 |
| NBI report | CONRAIL RAILROAD | CONRAIL S/MCKINLEY | 400 FT S/MCKINLEY AVENUE | Steel Box beam or girders - Multiple | -- | 1930 | -- | 34.1 | 64.0 | 0.0 | -- | 2562251 |
| NBI report | RR | UNDER CSX RR | 0.89 MI W OF N FOURTH ST | Steel Girder and floorbeam system | -- | 1930 | -- | 44.9 | 89.9 | 0.0 | -- | 2502348 |
| NBI report | CSX RAILROAD | NWIDE BLVD (U) CSX RR | .41 MI W/NEIL AVENUE | Steel Girder and floorbeam system | -- | 1930 | -- | 67.9 | 71.9 | 0.0 | -- | 2562693 |
| NBI report | CSX RAILROAD | NWIDE BLVD (U) CSX RR | .42 MI W/NEIL STREET | Steel Girder and floorbeam system | -- | 1930 | -- | 65.9 | 69.9 | 0.0 | -- | 2562642 |
| NBI report | CSX RAILROAD | NWIDE BLVD (U) CSX RR | .43 MI W/NEIL AVENUE | Steel Girder and floorbeam system | -- | 1930 | -- | 65.9 | 69.9 | 0.0 | -- | 2562588 |
| NBI report | WATKINS ROAD | NS ROAD (0) NS RAILROAD | .5MI E/FAIRWOOD AVENUE | Steel Stringer/Multi-beam or girder (9 spans) | -- | 1930 | -- | 58.1 | 477.1 | 95.0 | -- | 2560615 |
| NBI report | NORFOLK SOUTHERN | UNDER NS RR | 0.8 MI W OF SR71 | Steel Stringer/Multi-beam or girder | -- | 1931 | -- | 35.1 | 52.2 | 0.0 | -- | 2509032 |
| NBI report | US 62 | SCIOTO BIG RUN | 1 MI N OF SR 270 | Prestressed Box beam or girders - Multiple | -- | 1931 | 1979 | 49.9 | 53.2 | 96.0 | -- | 2503077 |
| NBI report | CSX RR | UNDER CSX RR | 0.76 MI W OF SR71 | Steel Stringer/Multi-beam or girder | -- | 1931 | -- | 35.1 | 52.2 | 0.0 | -- | 2509067 |
| NBI report | CONRAIL RR | UNDER NS RR | 0.42 MI W OF SR70 | Steel Girder and floorbeam system | -- | 1931 | -- | 42.0 | 63.0 | 0.0 | -- | 2501740 |
| NBI report | US 62 | NE SCIOTO BIG RUN | 2MI N OF SR270 | Prestressed Box beam or girders - Multiple | -- | 1931 | 1982 | 24.6 | 25.9 | 96.3 | -- | 2503107 |
| NBI report Bridgehunter | SR 00033 | OLENTANGY RIVER | 0.16 MI E OF SR315 | Concrete Arch - Thru (5 spans) | -- | 1932 | 1999 | 73.2 | 438.0 | 92.2 | -- | 2501449 |
| NBI report | NS RAILROAD | NS RR E/FAIRWOOD AVENUE | .5 MI E/FAIRWOOD AVENUE | Steel Stringer/Multi-beam or girder | -- | 1932 | -- | 40.0 | 57.1 | 0.0 | -- | 2562057 |
| NBI report | OLENTANGY RIVER RD | TURKEY RUN(OLENT RIV RD) | 0.5 MI N. OF W.N.BROADWAY | Concrete Slab | -- | 1932 | -- | 20.0 | 23.0 | 83.9 | -- | 2534924 |
| NBI report | BUILDING | L STREET (U) LAZARUS | (U)LAZARUS 39' E/FRONT ST | Steel Girder and floorbeam system | -- | 1934 | -- | 33.1 | 33.1 | 0.0 | -- | 2562235 |
| NBI report | CSX RAILROAD | VANT AVE (U) CSX RAILROA | 150 FT E/YALE AVENUE | Steel Girder and floorbeam system | -- | 1935 | -- | 38.1 | 69.9 | 0.0 | -- | 2560631 |
| NBI report | CSX RAILROAD | AVE (U) CSX RAILROAD | 400 FT W/OLNTNGY RIVER RD | Steel Girder and floorbeam system | -- | 1937 | -- | 44.9 | 65.0 | 0.0 | -- | 2560143 |
| NBI report | CSX RAILROAD | AVE (U) CSX RAILROAD | 350 FT W/OLNTNGY RIVER RD | Steel Girder and floorbeam system | -- | 1937 | -- | 44.9 | 65.9 | 0.0 | -- | 2560100 |
| NBI report | FRONT STREET | OVER PED TUNNEL AT CHAPE | AT CHAPEL STREET | Concrete Girder and floorbeam system (3 spans) | -- | 1939 | -- | 22.0 | 69.9 | 61.4 | FO | 2562227 |
| NBI report | CSX RAILROAD | LE BLVD (U) CSX RAILROAD | 300 FT W/OLNTNGY RIVER RD | Steel Girder and floorbeam system | -- | 1939 | -- | 44.9 | 65.9 | 0.0 | -- | 2560151 |
| NBI report | FIFTH AVE | OLENTANGY RIVER (FIFTH) | NEAR OLENTANGY RIVER RD | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1939 | 1992 | 78.1 | 359.9 | 75.4 | FO | 2531518 |
| NBI report | W. NORTH BROADWAY | OLENT.RV(W.N.BROADWAY) | 0.5 MI WEST OF HIGH ST | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1939 | 1980 | 101.1 | 452.1 | 92.3 | -- | 2531496 |
| NBI report | CSX RAILROAD | C&O #3 W/STARLING | 200 FT W/STARLING STREET | Steel Girder and floorbeam system | -- | 1940 | -- | 53.2 | 81.0 | 0.0 | -- | 2562944 |
| NBI report Bridgehunter | GEORGESVILLE RD | BIG RUN(GEORGESVILLE RD) | 0.1 MI. NORTH OF CLIME RD | Concrete Arch - Deck | -- | 1940 | 1973 | 39.0 | 41.0 | 91.7 | -- | 2531429 |
| NBI report | BRICE RD | BLACKLICK CREEK (BRICE) | 0.5 MI SOUTH OF REFUGEE | Concrete Slab (3 spans) | -- | 1940 | 1987 | 40.0 | 107.0 | 93.0 | -- | 2530724 |
| NBI report | US-33 (LIVINGSTON) | ALUM CREEK | 0.06 MI E OF IR70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1940 | 1966 | 55.1 | 192.9 | 91.3 | -- | 2501635 |
| NBI report | REYN-NEW ALBANY RD | BLACKLICK CR(RNA) | 0.1 MI SOUTH OF BROAD ST | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1940 | 1978 | 42.0 | 112.9 | 99.0 | -- | 2530562 |
| NBI report | DUBLIN RD | HAYDEN RUN (DUBLIN) | AT HAYDEN RUN RD | Concrete Culvert | -- | 1941 | 1996 | 23.0 | 25.9 | 72.2 | -- | 2530929 |
| NBI report | STELZER ROAD | ER ROAD (0) CSX RAILROAD | 450FT S/FIFTH AVE | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1943 | 2003 | 86.0 | 394.0 | 86.5 | -- | 2560550 |
| NBI report | GROVES ROAD | MASON RUN E/COURTRIGHT R | 250 FT E/COURTRIGHT ROAD | Prestressed Box beam or girders - Multiple | -- | 1946 | 1978 | 29.9 | 34.1 | 99.4 | -- | 2561603 |
| NBI report | SR-317 | BIG WALNUT CREEK | 1.43 MI N OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1946 | 2007 | 77.4 | 205.1 | 94.9 | -- | 2516411 |
| NBI report | CSX & NS RR | UNDER NS RR | 0.43 MI E OF SR315 | Steel Girder and floorbeam system | -- | 1946 | -- | 60.0 | 99.1 | 0.0 | -- | 2502550 |
| NBI report | CONRAIL RAILROAD | CONRAIL #2 N/BROAD ST | 750 FT N/BROAD STREET | Steel Stringer/Multi-beam or girder | -- | 1948 | -- | 53.2 | 59.1 | 0.0 | -- | 2562871 |
| NBI report | CONRAIL RAILROAD | LEY AVE (U) CONRAIL | (U) CONRAIL E/RODGERS AVE | Steel Stringer/Multi-beam or girder | -- | 1948 | -- | 63.0 | 135.2 | 0.0 | -- | 2561123 |
| NBI report | CONRAIL | AL STREET (U) CONRAIL | 200 FT W/STARLING STREET | Steel Stringer/Multi-beam or girder | -- | 1949 | -- | 29.9 | 204.1 | 0.0 | -- | 2561816 |
| NBI report | SYLVAN AVENUE | DRY RUN N/BROAD ST | .27 MI N/BROAD ST | Steel Stringer/Multi-beam or girder | -- | 1949 | -- | 19.0 | 22.0 | 80.7 | FO | 2561050 |
| NBI report | CSX RAILROAD | AVE (U) CSX RAILROAD | 650 FT W/OLNTNGY RIVER RD | Steel Stringer/Multi-beam or girder | -- | 1951 | -- | 34.1 | 94.2 | 0.0 | -- | 2560178 |
| NBI report | SR00033 | OLENTANGY RIVER | 0.16 MI E OF SR315 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1954 | 1999 | 76.1 | 400.0 | 77.9 | FO | 2501473 |
| NBI report | I-70 | OVER CSX & NS RR | 0.54 MI E OF I-71 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1956 | 1975 | 95.1 | 332.0 | 83.1 | -- | 2504502 |
| NBI report | C&O RR | UNDER CSX RR (OLD C&O) | 0.12 MI E OF US 33DA | Steel Girder and floorbeam system | -- | 1956 | -- | 52.2 | 59.1 | 0.0 | -- | 2501503 |
| NBI report | I-70 | OVER SHORT ST | 0.72 MI E OF US62 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1956 | 1975 | 54.1 | 123.0 | 84.3 | -- | 2504537 |
| NBI report | SR 16 | OVER BIG WALNUT CREEK | 0.44 MI N OF SR317 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1956 | 1998 | 85.0 | 225.4 | 96.4 | -- | 2500337 |
| NBI report | FRONT STREET | CONRAIL N/NATIONWIDE | 450 FT N/NATIONWIDE BLVD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1957 | 1992 | 85.0 | 313.0 | 75.1 | FO | 2560321 |
| NBI report | RR | UNDER NORFOLK SOUTHERN R | 0.53 MI E OF US33DA | Steel Girder and floorbeam system | -- | 1957 | -- | 52.2 | 65.9 | 0.0 | -- | 2501538 |
| NBI report | BUILDING | LAZARUS S/STATE STREET | (U) LAZARUS S/STATE ST | Concrete Tee beam | -- | 1957 | -- | 34.1 | 35.1 | 0.0 | -- | 2562308 |
| NBI report | SR 23 | OVER RR YARDS GOODALE ST | OVER RR YARDS GOODALE ST | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1957 | 1980 | 243.1 | 1338.0 | 89.6 | FO | 2500876 |
| NBI report | CONRAIL RAILROAD | CONRAIL W/I71 W/STR | 400 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1958 | -- | 36.1 | 74.2 | 0.0 | -- | 2560267 |
| NBI report | RAMP TO GOODALE | 315 NB RAMP TO GOODALE | .1 MI NORTH OF GOODALE AV | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1958 | 2000 | 76.1 | 474.4 | 85.0 | -- | 2515350 |
| NBI report | CSX RR | UNDER ABANDONED CSX RR | 0.54MI E OF SR315 O RAMPS | Steel Girder and floorbeam system | -- | 1958 | -- | 124.0 | 124.0 | 0.0 | -- | 2506068 |
| NBI report | I-70 | EB70 OVER SCIOTO RIVER | 0.21 MI E OF I-71 | Steel Stringer/Multi-beam or girder (9 spans) | -- | 1958 | 1975 | 128.0 | 958.4 | 55.6 | SD | 2504448 |
| NBI report | US-40 (BROAD ST.) | OVER SR315 | 1.4 MI E OF IR70 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1958 | 1999 | 53.2 | 110.6 | 73.0 | FO | 2502496 |
| NBI report | NS RAILROAD | N&W W/I71 E/STR | 400 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1958 | -- | 36.1 | 74.2 | 0.0 | -- | 2560313 |
| NBI report | I-71 | BISON RUN | 0.25 MI S OF I-270 | Steel Culvert | -- | 1959 | 1965 | 13.1 | 25.9 | 70.0 | -- | 2508311 |
| NBI report | RAMP SR 315 TO 70E | RMP(315SB TO 70EB)OVNB31 | 0.3 MI N OF I70 | Steel Stringer/Multi-beam or girder | -- | 1959 | 1997 | 69.6 | 76.4 | 83.0 | FO | 2514885 |
| NBI report | SR 317 | OVER CSX & NS RR | 2.40 MI E OF US23 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1959 | -- | 76.1 | 504.9 | 92.2 | -- | 2516233 |
| NBI report | I-71 | OVER GREENLAWN AVE | 3.75 MI N OF I270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1959 | -- | 60.0 | 160.1 | 73.6 | -- | 2507536 |
| NBI report | I-71 | OVER SR-161 | 1.32 MI S OF I-270 | Concrete Slab (4 spans) | -- | 1959 | 2001 | 47.6 | 172.6 | 74.6 | -- | 2508257 |
| NBI report | MORSE RD. | OVER MORSE RD | 1.95 MI S OF SR161 | Concrete Slab (4 spans) | -- | 1959 | -- | 47.6 | 174.9 | 70.5 | -- | 2508192 |
| NBI report | EAST N BROADWAY | I 71 | 2.31 MI N OF 17TH AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1959 | 1997 | 65.6 | 215.2 | 87.5 | FO | 2508109 |
| NBI report | I-70 | 315SB TO 70 EB OVER RAMP | 0.11 MI E. OF I-71 | Steel Stringer/Multi-beam or girder | -- | 1959 | 1997 | 71.2 | 78.4 | 81.7 | -- | 2504383 |
| NBI report | WEBER RD | I 71 | 1.83 MI N OF 17TH AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1959 | 1995 | 62.0 | 202.8 | 91.2 | FO | 2508079 |
| NBI report | HUDSON ST | I 71 | 1.18 MI N OF 17TH AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1959 | -- | 68.6 | 224.1 | 78.2 | FO | 2508044 |
| NBI report | I-71 | OVER GREENLAWN AVE | 3.75 MI N OF I 270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1959 | -- | 60.0 | 160.1 | 73.6 | -- | 2507560 |
| NBI report | RR | UNDER NS RR | 0.8 MI N OF SR3 | Steel Girder and floorbeam system | -- | 1960 | -- | 71.9 | 149.9 | 0.0 | -- | 2507897 |
| NBI report | CONRAIL/NS RR'S | AVE (U) CONRAIL & NS RR | .38 MI W/JOYCE AVENUE | Steel Stringer/Multi-beam or girder | -- | 1960 | -- | 36.1 | 77.1 | 0.0 | -- | 2560259 |
| NBI report | I.R. 71 | OVER COOKE RD | 3.38 MI N 17TH AVE | Concrete Slab (4 spans) | -- | 1960 | -- | 47.6 | 175.2 | 62.5 | -- | 2508133 |
| NBI report | I-71 | OVER COOKE RD | 3.38 MI N. OF 17TH AVE | Concrete Slab (4 spans) | -- | 1960 | -- | 47.6 | 175.2 | 61.5 | -- | 2508168 |
| NBI report | I.R. 71 | OVER MORSE RD | 1.95 MI S OF SR161 | Concrete Slab (4 spans) | -- | 1960 | -- | 47.6 | 174.9 | 52.5 | -- | 2508222 |
| NBI report | I-71 | BIG RUN CREEK | 1.13 MI N OF I270 | Concrete Slab (3 spans) | -- | 1960 | 1974 | 38.1 | 99.1 | 94.1 | -- | 2507412 |
| NBI report | I-71 | BIG RUN CREEK | 1.13 MI N OF I270 | Concrete Slab (3 spans) | -- | 1960 | 1974 | 38.1 | 99.1 | 86.2 | -- | 2507447 |
| NBI report | I-71 | OVER FRANK RD | 2.1 MI N OF I270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1960 | 1974 | 60.0 | 222.1 | 63.9 | SD | 2507471 |
| NBI report | RAMP P 670W-23N | RAMP 670WB-23NB O SERVIC | RAMP P:670W TO 23N | Concrete Slab (3 spans) | -- | 1960 | -- | 42.7 | 111.9 | 54.0 | SD | 2517795 |
| NBI report | I-71 | OVER FRANK RD | 2.1 MI N OF I270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1960 | 1974 | 60.0 | 222.1 | 93.2 | -- | 2507501 |
| NBI report | T | PED WALKWAY S/BROAD ST | (U) PED WALKWAY S/BROAD S | Steel Stringer/Multi-beam or girder | -- | 1960 | -- | 38.1 | 39.0 | 0.0 | -- | 2561425 |
| NBI report | 11TH AVE | I71 | 0.26 MI N OF SR3 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1961 | -- | 60.0 | 208.7 | 75.7 | SD | 2507927 |
| NBI report | I-71 | OVER VELMA AVE | 0.67 MI N OF 17TH AVE | Concrete Slab (4 spans) | -- | 1961 | -- | 44.9 | 166.3 | 61.9 | -- | 2507986 |
| NBI report | FIFTH AVE | I71 | 1 MI N OF I-670 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1961 | 1999 | 73.2 | 238.2 | 87.2 | FO | 2507862 |
| NBI report | I-71 | OVER 17TH AVE | 0.73 MI N OF SR3 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1961 | -- | 65.0 | 147.6 | 88.2 | FO | 2507951 |
| NBI report | I-71 | OVER SECOND AVE | 0.66 MI N OF I-670 | Concrete Slab (3 spans) | -- | 1961 | -- | 55.1 | 139.1 | 45.7 | SD | 2507838 |
| NBI report | I-70 | NS RR, I-670 & RAMP B,C, | 0.45 MI N OF I670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1961 | -- | 235.9 | 624.4 | 59.9 | -- | 2507803 |
| NBI report | SR 16 | BLACKLICK CREEK | 0.17 MI. S. OF SR 161 | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1961 | 2008 | 54.1 | 113.2 | 85.9 | -- | 2500396 |
| NBI report | SR 16 | UTZINGER DITCH | 0.77 MI. S. OF SR161 | Concrete Slab | -- | 1961 | -- | 20.0 | 22.0 | 55.0 | SD | 2500361 |
| NBI report | LIVINGSTON AVENUE | MASON RUN W/COURTRIGHT R | (O) MASON RUN W/CRTRGT RD | Concrete Slab | -- | 1961 | -- | 29.9 | 32.2 | 78.0 | FO | 2560623 |
| NBI report | 23S RAMP TO 670 E | RAMP US23DS-I670E OVER 2 | .03 MI S OF IR670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1961 | 2003 | 69.9 | 173.2 | 73.5 | -- | 2506246 |
| NBI report | SR3 | OVER I-71 | 0.9 MI. N. 5TH AVE | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1961 | -- | 128.3 | 266.7 | 74.1 | FO | 2500094 |
| NBI report | I-670 | OVER ROSS LAB ACCESS RD. | 1.95 MI E OF SR315 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1962 | 2003 | 89.9 | 241.8 | 84.0 | -- | 2506335 |
| NBI report | SR 317 | OVER US-33 | 3.28 MI S OF I270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1962 | -- | 108.9 | 337.9 | 92.8 | FO | 2516381 |
| NBI report | I-270 | OVER ACCESS RD | 0.68 MI W OF US23 | Concrete Slab (3 spans) | -- | 1962 | -- | 27.6 | 73.2 | 92.0 | -- | 2513382 |
| NBI report | I-270 | OVER ACCESS RD | 0.68 MI W OF US23 | Concrete Slab (3 spans) | -- | 1962 | -- | 24.9 | 73.2 | 92.0 | -- | 2513412 |
| NBI report | BROAD ST (US40) | OVER I-71 | 1.93 MI E OF SR315 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1962 | -- | 60.0 | 182.4 | 61.0 | SD | 2502615 |
| NBI report | I-670 | OVER CONV CTR CONN & RR | 0.15 MI E OF SR315 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1962 | 2003 | 202.1 | 499.0 | 81.0 | -- | 2506300 |
| NBI report | I-270 | SCIOTO RIVER | 0.81 MI E OF US 23 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1962 | -- | 107.0 | 731.0 | 88.9 | -- | 2513358 |
| NBI report | LIVINGSTON AVE | BIG WALNUT (LIVINGSTON) | 0.1 MI W. OF NOE-BIXBY RD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1962 | 1975 | 82.0 | 312.0 | 62.3 | FO | 2533103 |
| NBI report | I-270 | SCIOTO RIVER | 0.81 MI E OF US23 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1962 | -- | 107.0 | 731.0 | 88.9 | -- | 2513323 |
| NBI report | I-71 | OVER CLEVELAND AVE (SR3) | 0.24 MI W OF IR71 | Steel Stringer/Multi-beam or girder | -- | 1963 | 2003 | 75.8 | 81.0 | 84.2 | -- | 2506394 |
| NBI report | I-71 | OVER LEONARD AVE | 0.22 MI N OF I670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1963 | -- | 59.1 | 149.0 | 92.6 | -- | 2507773 |
| NBI report | I-71 | RAMP OVER LEONARD RAMP | 0.22 MI N OF I-670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1963 | 1995 | 52.8 | 131.9 | 83.0 | -- | 2507714 |
| NBI report | I-71 | 71SB OVR RAMP 71NB TO 67 | 0.08 MI S OF I670 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1963 | -- | 79.1 | 257.9 | 70.9 | FO | 2507684 |
| NBI report | SPRING ST. | I71NB | 0.3 MI N OF US40 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1963 | 2003 | 69.2 | 194.2 | 75.3 | -- | 2506483 |
| NBI report | I.R. 71 | SPRING RAMP OVER SB RAMP | 0.44 MI N OF US40 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1963 | -- | 89.9 | 311.0 | 64.9 | FO | 2507625 |
| NBI report | THIRD ST | S 3RD ST(US-33) OVER I-7 | 0.82 E OF SR 3 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1963 | -- | 61.0 | 126.6 | 67.1 | FO | 2504596 |
| NBI report | SPRING ST. | I71SB | 0.30 MI N OF US40 | Steel Stringer/Multi-beam or girder | -- | 1963 | 2003 | 73.5 | 77.8 | 58.4 | -- | 2506513 |
| NBI report | LONG ST. | OVER FRA-71-1775 | 0.19 MI N OF US40 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1963 | 2003 | 82.0 | 288.1 | 86.4 | -- | 2506548 |
| NBI report | US 40 | BROAD ST RAMP TO NB71 | 1.94 MI E OF SR315 | Concrete Slab (11 spans) | -- | 1963 | -- | 24.9 | 257.2 | 79.0 | -- | 2506572 |
| NBI report | 6TH ST WALK | UNDER 6TH ST WALK | 0.19 MI E OF US23 | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 83.7 | 211.0 | 0.0 | -- | 2504626 |
| NBI report | LEONARD AVE | OVER LEONARD AVE | 0.22 MI N OF I-670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1963 | -- | 60.0 | 154.9 | 86.1 | -- | 2507749 |
| NBI report | PARSONS AVE. | RAMP I70WB TO I71NB | 0.64 MI E OF US23 | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 137.1 | 148.0 | 69.4 | FO | 2506696 |
| NBI report | GRANT AVE | GRANT AVE OVER 70-1456 | 0.27 MI E OF US23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1963 | -- | 73.5 | 239.5 | 68.2 | FO | 2504650 |
| NBI report | I-71 | RAMP I670 EB TO I71NB | 0.24 MI E OF SR3 | Steel Stringer/Multi-beam or girder (12 spans) | -- | 1963 | -- | 123.0 | 939.0 | 31.2 | SD | 2506459 |
| NBI report | REFUGEE RD (CR-14) | US-33 | 4.2 MI W OF US23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1963 | 2009 | 81.4 | 261.5 | 63.0 | -- | 2501864 |
| NBI report | US 33 | WALNUT CREEK OVERFLOW | 0.28 MI W OF SR270 | Concrete Slab (3 spans) | -- | 1963 | -- | 35.1 | 92.5 | 95.0 | -- | 2501953 |
| NBI report | CONRAIL | ROAD (U) CONRAIL | 400 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 44.0 | 163.1 | 0.0 | -- | 2560488 |
| NBI report | NS RAILROAD | ROAD (U) NS RAILROAD | 350 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 44.0 | 163.1 | 0.0 | -- | 2560461 |
| NBI report | US 33 | BIG WALNUT CR | 0.34 MI W OF SR270 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1963 | -- | 74.5 | 303.2 | 88.7 | -- | 2501988 |
| NBI report | TOWN ST | OVER FRA-71-1732 | 0.25 MI S OF US40 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1963 | 1997 | 76.1 | 208.7 | 73.5 | FO | 2506637 |
| NBI report | US 33 | BIG WALNUT CR | 0.34 MI W OF SR270 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1963 | -- | 74.5 | 303.2 | 88.7 | -- | 2502011 |
| NBI report | US 33 | WALNUT CREEK OVERFLOW | 0.28 MI W OF SR270 | Concrete Slab (3 spans) | -- | 1963 | -- | 35.1 | 93.5 | 95.0 | -- | 2501929 |
| NBI report | COURTRIGHT ROAD | MASON RUN S/LIVINGSTON A | (0)MASON RUN S/LIVINGSTON | Concrete Slab | -- | 1963 | 1972 | 34.1 | 36.1 | 96.4 | -- | 2562081 |
| NBI report | NS RAILROAD | N&W W/I-71 E/STR | 650 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 39.0 | 83.0 | 0.0 | -- | 2561840 |
| NBI report | I-670 | OVER CLEVELAND AVE (SR3) | 0.24 MI W OF IR71 | Steel Stringer/Multi-beam or girder | -- | 1963 | 2003 | 76.4 | 81.0 | 89.7 | -- | 2506424 |
| NBI report | FRONT ST (US23) | OVER IR 70 | 0.94 MI E OF I-71 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1963 | -- | 73.2 | 142.1 | 69.2 | FO | 2504561 |
| NBI report | WINCHESTER PIKE | WINCHESTER PKE OVER NB33 | 1.99 MI E OF SR270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1963 | -- | 103.0 | 254.9 | 84.9 | FO | 2501805 |
| NBI report | CONRAIL RAILROAD | CONRAIL W/I-71 WSTR | 750 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1963 | -- | 39.0 | 83.0 | 0.0 | -- | 2561794 |
| NBI report | CONRAIL RR | UNDER NS RR | 0.42 MI W OF SR70 | Steel Girder and floorbeam system | -- | 1963 | -- | 60.0 | 62.0 | 0.0 | -- | 2501716 |
| NBI report | OVERBROOK DRIVE | CREEK #1 W/INDIANOLA | 900 FT W/INDIANOLA AVENUE | Concrete Slab | -- | 1964 | -- | 18.0 | 21.0 | 95.9 | -- | 2562138 |
| NBI report | SR 317 | OVER NS RR & TRURO STA R | 0.19 MI S OF I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1964 | 2007 | 72.5 | 185.7 | 87.1 | -- | 2516470 |
| NBI report | I-70 | OVER I-71 | 0.53 MI E OF US23 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1964 | 2003 | 96.5 | 349.1 | 87.2 | -- | 2504685 |
| NBI report | HIGH STREET | S HIGH ST(US23D) OVER I7 | 0.1 MI E OF FRONT ST | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 71.5 | 241.5 | 78.0 | FO | 2500817 |
| NBI report | JAMES RD EXT | US 33 NB | 0.62 MI W OF SR71 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1964 | -- | 69.6 | 444.6 | 81.1 | FO | 2501775 |
| NBI report | HAMILTON RD (317) | OVER I-70 | 1.33 MI N OF I270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 88.9 | 288.4 | 86.5 | -- | 2516500 |
| NBI report | FOURTH ST (US23) | S 4TH ST(US-23) OVER I-7 | 1.59 MI S OF IR-670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1964 | -- | 92.9 | 214.6 | 73.0 | FO | 2500639 |
| NBI report | ALUM CK.RMP TO I70 | RAMP E O NS RR/NELSON RD | 0.66 MI E OF KELTON AVE | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1964 | 2003 | 87.6 | 387.5 | 79.2 | -- | 2505045 |
| NBI report | I-70 | OVER NS RR & NELSON RD | 0.66 MI E OF KELTON AVE | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1964 | 2003 | 89.9 | 400.9 | 85.0 | -- | 2505134 |
| NBI report | I-70 | OVER ALUM CREEK DRIVE | 0.91 MI E OF KELTON AVE. | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1964 | -- | 71.9 | 193.9 | 83.5 | -- | 2505169 |
| NBI report | I-70 | OVER US 33(LIVINGSTON) | 1.1 MI E OF KELTON AVE | Steel Stringer/Multi-beam or girder | -- | 1964 | -- | 68.9 | 76.1 | 89.7 | -- | 2505193 |
| NBI report | I-70 | OVER ALUM CREEK | 0.23 MI W OF COLLEGE AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | 2003 | 80.1 | 293.6 | 92.2 | -- | 2505223 |
| NBI report | I-70 | OVER ALUM CREEK | 0.23 MI W OF COLLEGE AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | 2003 | 80.1 | 293.6 | 92.2 | -- | 2505258 |
| NBI report | FRA-33 | OVER US-33 | 0.65 MI W OF JAMES RD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | 2003 | 91.9 | 293.6 | 88.9 | -- | 2505312 |
| NBI report | I-70 | MASON RUN | 0.89 MI E OF JAMES RD | Concrete Slab (3 spans) | -- | 1964 | 2003 | 24.9 | 65.3 | 93.4 | -- | 2505371 |
| NBI report | I-70 | MASON RUN | 0.89 MI E. OF JAMES RD. | Concrete Slab (3 spans) | -- | 1964 | 2003 | 24.9 | 65.3 | 93.4 | -- | 2505401 |
| NBI report | COURTRIGHT | IR 70 | 0.96 MI E. OF JAMES RD | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1964 | -- | 82.0 | 453.8 | 86.4 | FO | 2505436 |
| NBI report | I-70 | BIG WALNUT CREEK | 0.75 MI E OF SR317 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1964 | 2003 | 74.5 | 231.6 | 93.4 | -- | 2505584 |
| NBI report | I-70 | OVER FAIRWOOD AVE | 0.38 MI E OF KELTON AVE | Steel Stringer/Multi-beam or girder | -- | 1964 | -- | 65.9 | 70.9 | 77.5 | -- | 2505010 |
| NBI report | KELTON AVE | IR 70 | 0.08 MI E OF KELTON AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 71.9 | 248.0 | 92.6 | FO | 2504987 |
| NBI report | BERWICK BOULEVARD | BLISS RUN N/HADDON | 350 FT N/HADDON ROAD | Concrete Slab | -- | 1964 | -- | 21.0 | 23.0 | 95.1 | -- | 2561662 |
| NBI report | I-70 | OVER PARSONS AVE & RAMP | 0.64 MI E OF US23 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1964 | 2003 | 86.3 | 425.2 | 89.4 | -- | 2504774 |
| NBI report | PARSONS AVE | PARSONS AVE OVER 70-1493 | 0.64 MI E OF US23 | Concrete Slab (3 spans) | -- | 1964 | -- | 49.9 | 131.6 | 72.5 | FO | 2504804 |
| NBI report | 18TH ST. | IR 70 | 0.96 MI E OF US23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | 2001 | 80.7 | 277.9 | 74.4 | -- | 2504839 |
| NBI report | OHIO AVE. | IR 70 | 1.24 MI E OF US23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | 2001 | 71.9 | 248.0 | 73.9 | -- | 2504863 |
| NBI report | JAMES RD EXT. | JAMES RD EXT OVER 70-193 | 2.01 MI W OF SR317 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 85.0 | 293.6 | 82.1 | FO | 2505347 |
| NBI report | CLIME RD | BIG RUN (CLIME RD) | .3 MI E OF GEORGESVLLE RD | Concrete Slab (3 spans) | -- | 1964 | 1966 | 40.0 | 107.9 | 98.9 | -- | 2531712 |
| NBI report | CHAMPION AVE. | IR 70 | 0.35 MI E OF 18TH ST | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 71.9 | 248.0 | 69.2 | FO | 2504898 |
| NBI report | I-70 | OVER US-33 | 0.65 MI W OF JAMES RD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | 2003 | 91.9 | 293.6 | 88.3 | -- | 2505282 |
| NBI report | LINWOOD AVE | IR 70 | 0.58 MI E OF 18TH ST | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 88.9 | 299.9 | 87.1 | FO | 2504928 |
| NBI report | MILLER AVE | IR 70 | 0.07 MI. E. OF MILLER AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 71.9 | 248.0 | 88.7 | FO | 2504952 |
| NBI report | I-70 | BIG WALNUT CREEK | 2.76 MI E OF JAMES RD | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1964 | 2003 | 74.5 | 231.6 | 93.4 | -- | 2505525 |
| NBI report | EAKIN RD | EARLY RUN (EAKIN) | 0.6 MI WEST OF S.R.3 | Prestressed Box beam or girders - Multiple | -- | 1965 | -- | 25.9 | 29.9 | 75.5 | -- | 2530236 |
| NBI report | PARSONS AVE | RAMP I71SB TO I70EB | 0.54 MI S OF US40 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1965 | -- | 92.9 | 240.2 | 71.9 | FO | 2506661 |
| NBI report | MCKINLEY AVENUE | STREAM N/FISHER | .22 MI N/FISHER ROAD | Concrete Slab | -- | 1965 | -- | 20.0 | 24.0 | 99.6 | -- | 2561182 |
| NBI report | JAMES ROAD | CONRAIL S/I-70 | .2 MI S/I-70 | Concrete Slab (3 spans) | -- | 1965 | -- | 53.2 | 138.1 | 97.3 | -- | 2560895 |
| NBI report | OAK ST | IR 71 | 0.9 MI S OF US40 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1965 | -- | 91.9 | 219.2 | 77.9 | FO | 2506602 |
| NBI report | MAIN STREET | I71 | 0.43 MI S OF US 40 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1965 | 1997 | 80.4 | 313.0 | 79.8 | FO | 2501562 |
| NBI report | 71SB TO 70EB | OVER RAMP I71SB TO I70EB | 0.53 MI S OF US40 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1965 | -- | 107.9 | 247.4 | 76.3 | FO | 2507595 |
| NBI report | RAMP TO 270WB | OVER IR 71 | 0.53 MI N OF SR710 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1966 | -- | 81.7 | 269.0 | 67.0 | -- | 2511223 |
| NBI report | REFUGEE ROAD | MASON RUN W/HAMILTON ROA | (O) MASON RUN W/HAMILTON | Concrete Culvert (2 spans) | -- | 1966 | -- | 14.1 | 31.2 | 78.2 | -- | 2561549 |
| NBI report | COURTRIGHT ROAD | MASON RUN S/I-70 | 550 FT S/I-70 | Concrete Culvert (2 spans) | -- | 1966 | -- | 13.1 | 26.9 | 90.2 | -- | 2560011 |
| NBI report | FRONT STREET | CONRAIL S/NATIONWIDE | 300 FT S/NATIONWIDE BLVD | Steel Stringer/Multi-beam or girder | -- | 1966 | -- | 77.1 | 85.0 | 73.0 | FO | 2560275 |
| NBI report | WOODBROOK LANE | EARLY DITCH S/EAKIN | 600 FT S/EAKIN ROAD | Concrete Slab | -- | 1966 | -- | 19.0 | 23.0 | 59.3 | -- | 2561190 |
| NBI report | 71NBTO270WBRAMP | OVER RAMP 71NB-270WB | 0.16 MI E OF I71 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1966 | -- | 75.1 | 185.0 | 78.1 | FO | 2511460 |
| NBI report | SUNBURY RD | ALUM CREEK (SUNBURY RD) | AT MOCK RD | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1966 | -- | 73.2 | 149.9 | 84.1 | -- | 2530791 |
| NBI report | INNIS RD | ALUM CREEK (INNIS RD) | 0.1 MI WEST OF SUNBURY RD | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1966 | 2005 | 75.1 | 350.1 | 73.2 | -- | 2530805 |
| NBI report | RAMP TO 71SB | IR 71 | 0.49 MI N OF SR710 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1966 | -- | 85.0 | 272.0 | 76.0 | FO | 2511371 |
| NBI report | SR 710 | SHROCK RD. OVER I-270 | 2.73 MI N OF SR161 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1966 | 1988 | 115.2 | 386.8 | 96.6 | -- | 2517469 |
| NBI report | COURTRIGHT ROAD | MASON RUN N/I-70 | 450 FT N/I-70 | Concrete Culvert (2 spans) | -- | 1966 | -- | 15.1 | 34.1 | 89.6 | -- | 2562154 |
| NBI report | SR 317 | MILLER DITCH | 0.52 MI W OF I70 | Prestressed Box beam or girders - Multiple | -- | 1966 | -- | 32.5 | 33.5 | 43.2 | SD | 2516446 |
| NBI report | BRICE RD | BRICE RD OVER 70-2392 | 1.19 MI E OF I-270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1966 | -- | 98.4 | 296.9 | 78.7 | SD | 2505738 |
| NBI report | WILLIAMS RD | BIG WALNUT (WILLIAMS RD) | 1.1 MI WEST OF HAMILTON | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1968 | 1999 | 94.2 | 326.1 | 88.3 | -- | 2532441 |
| NBI report | I.R. 270 | CSX RR & PRIVATE RD. | 1.89 MI S OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1968 | -- | 71.9 | 178.2 | 88.7 | -- | 2513927 |
| NBI report | I.R. 270 | CSX RR & PRIVATE RD. | 1.89 MI S OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1968 | -- | 71.9 | 178.2 | 88.7 | -- | 2513951 |
| NBI report | GEORGESVILLE RD N | IR 270 | 2.84 MI N OF I-71 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | 2004 | 82.0 | 313.0 | 80.6 | -- | 2512637 |
| NBI report | GEORGESVILLE RD S | IR 270 | 2.85 MI N OF US62 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | 2004 | 82.0 | 313.0 | 78.6 | -- | 2512602 |
| NBI report | HALL RD | IR 270 | 3.34 MI N OF US62 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 84.0 | 289.1 | 70.1 | FO | 2512572 |
| NBI report | RR | UNDER CAMP CHASE RR | 5.90 MI N OF I71 | Steel Girder and floorbeam system | -- | 1968 | -- | 120.1 | 244.1 | 0.0 | -- | 2512548 |
| NBI report | I-270 | SCIOTO BIG RUN | 3.76 MI N OF US62 | Concrete Slab (3 spans) | -- | 1968 | -- | 33.1 | 86.0 | 86.9 | -- | 2512513 |
| NBI report | I-270 | SCIOTO BIG RUN | 3.76 MIN OF US62 | Concrete Slab (3 spans) | -- | 1968 | -- | 33.1 | 86.0 | 88.0 | -- | 2512483 |
| NBI report | I.R.270 | OVER BIG WALNUT/NOE BIXB | 0.83 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 122.1 | 459.0 | 73.5 | FO | 2514435 |
| NBI report | I.R. 270 | ALUM CREEK | 2.72 MI S OF SR317 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1968 | -- | 80.1 | 212.0 | 88.7 | -- | 2513986 |
| NBI report | I.R. 270 | ALUM CREEK | 2.72 MI S OF SR317 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1968 | -- | 80.1 | 212.0 | 88.7 | -- | 2514044 |
| NBI report | WILLIAMS RD | IR 270 | 4.5 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 97.1 | 325.1 | 57.1 | -- | 2514079 |
| NBI report | CLEVELAND AVE(710) | CLEVELAND AVE. OVER I-27 | 3.76 MI N OF SR161 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1968 | -- | 70.9 | 313.7 | 77.3 | FO | 2517493 |
| NBI report | REFUGEE RD | BIG WALNUT CR (REFUGEE) | 0.5 MI EAST OF HAMILTON | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1968 | -- | 85.0 | 224.1 | 63.9 | FO | 2530716 |
| NBI report | RIVER BEND ROAD | BEND RD(O)SCIOTO BIG RUN | .29 MI S/CLIME ROAD | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1968 | -- | 35.1 | 104.0 | 98.7 | -- | 2560666 |
| NBI report | I.R.270 | OVER BIG WALNUT/NOE BIXB | 0.83 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 122.1 | 459.0 | 73.5 | FO | 2514494 |
| NBI report | I.R.270 | OVER SR 317 | 1.88 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 66.9 | 245.1 | 84.1 | FO | 2514370 |
| NBI report | WILSON RD | CAMP CHASE RR (WILSON RD | 0.1 MI SOUTH OF BROAD ST | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1968 | -- | 73.2 | 196.9 | 76.9 | -- | 2531852 |
| NBI report | I.R.270 | OVER SR 317 | 1.88 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 66.9 | 245.1 | 84.1 | FO | 2514346 |
| NBI report | I.R.270 | OVER REFUGEE RD | 2.06 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 59.1 | 216.9 | 88.3 | -- | 2514311 |
| NBI report | I.R.270 | OVER REFUGEE RD | 2.06 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 59.1 | 216.9 | 88.3 | -- | 2514281 |
| NBI report | I.R. 270 | MASON RUN | 2.67 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1968 | -- | 32.2 | 91.9 | 88.3 | -- | 2514257 |
| NBI report | I.R. 270 | MASON RUN | 2.67 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1968 | -- | 32.2 | 91.9 | 88.3 | -- | 2514222 |
| NBI report | I-270 | OVER US-33 | 3.31 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 82.0 | 284.1 | 84.6 | -- | 2514168 |
| NBI report | I-270 | OVER US-33 | OVER USR33 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 82.0 | 284.1 | 87.7 | -- | 2514133 |
| NBI report | I.R. 270 | RAMP OVER US-33 | 3.31 MI S OF IR70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 82.0 | 284.1 | 90.8 | FO | 2514109 |
| NBI report | GRANDVIEW AVE | SCIOTO RIVER (GRANDVIEW) | .7 MI. SOUTH OF U.S. 33 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1968 | 2002 | 128.0 | 581.1 | 73.6 | -- | 2530295 |
| NBI report | I-270 | SCIOTO DARBY CR.RD & NSR | 2.34 MI N OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 85.0 | 296.3 | 74.1 | -- | 2509784 |
| NBI report | I-270 | SCIOTO DARBY CR.RD & NSR | 2.34 MI N OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 81.0 | 293.0 | 74.1 | -- | 2509725 |
| NBI report | ROBERTS RD | IR 270 | 1.81 MI N OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 82.0 | 285.1 | 39.5 | SD | 2509660 |
| NBI report | NOE BIXBY | NOE BIXBY RD OVER 70-223 | 0.39 MI W OF I-270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 133.9 | 434.4 | 71.8 | FO | 2505614 |
| NBI report | ROBERTS RD | IR 270 | 1.8 MI N OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1968 | -- | 82.0 | 285.1 | 73.3 | SD | 2509636 |
| NBI report | SULLIVANT | IR 270 | 6.17 MI N OF I-71 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1969 | -- | 81.4 | 281.5 | 77.6 | FO | 2512459 |
| NBI report | ROBERTS ROAD | CONRAIL W/I270 | (O) CONRAIL W/I270 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1969 | 1993 | 79.1 | 344.2 | 80.0 | -- | 2561832 |
| NBI report | CR 27 TRABUE RD | IR 270 | 0.6U MI N OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1969 | -- | 91.9 | 274.0 | 77.5 | -- | 2509512 |
| NBI report | RAMP TO 70EB | RAMP 270SB TO 70EB | 0.13 MI S OF I-70 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1969 | -- | 58.1 | 235.9 | 81.0 | FO | 2504170 |
| NBI report | I-270 | LT FRONTAGE RD OV RAY RU | 1.34 MI N OF I-70 | Concrete Slab | -- | 1969 | -- | 21.0 | 23.6 | 88.1 | -- | 2509547 |
| NBI report | RAMP TO 270SB | RAMP B 70WB TO 270SB | 1.84 MI N OF US40 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1969 | -- | 80.1 | 355.0 | 84.4 | -- | 2504162 |
| NBI report | LINWORTH RD. | IR 270 | 0.36 MI. WEST OF SR-315 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1969 | -- | 85.0 | 287.1 | 91.8 | -- | 2510715 |
| NBI report | I-270 | RAYMOND RUN | 1.34 MI N OF I-70 | Concrete Slab | -- | 1969 | -- | 21.0 | 23.3 | 84.9 | -- | 2509601 |
| NBI report | I-270 | RAYMOND RUN | 1.34 MI N OF I-70 | Concrete Slab | -- | 1969 | -- | 21.0 | 23.3 | 84.9 | -- | 2509571 |
| NBI report | WATKINS RD | US 33 | 0.19 MI E OF SR270 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1969 | -- | 76.1 | 344.2 | 74.5 | FO | 2501899 |
| NBI report | FISHER RD | IR 270 | 0.39 MI S OF I70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1969 | -- | 107.0 | 340.9 | 77.4 | FO | 2512122 |
| NBI report | SR 315 | OVER THIRD AVE | 2.62 MI N OF I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1969 | -- | 89.9 | 220.5 | 91.7 | -- | 2515369 |
| NBI report | SR 315 | OVER THIRD AVE | 2.62 MI N OF I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1969 | -- | 89.9 | 220.5 | 79.9 | -- | 2515334 |
| NBI report | CSX RAILROAD | CSX E/KENNY ROAD | 0.25 MI E/KENNY ROAD | Steel Stringer/Multi-beam or girder | -- | 1969 | -- | 44.0 | 91.9 | 0.0 | -- | 2560003 |
| NBI report | SB 315 | SB 315 OVER BIKEPATH | 2.55 MI N OF I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1969 | -- | 91.9 | 220.8 | 94.9 | -- | 2515245 |
| NBI report | I-270 | OVER CSX RR | 4.34 MI N OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1969 | 2001 | 57.1 | 149.9 | 91.2 | -- | 2510650 |
| NBI report | I-270 | OVER CSX RR | 4.34 MI N OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1969 | 2001 | 57.1 | 149.9 | 91.2 | -- | 2510685 |
| NBI report | SR 315 | OVER OLENTANGY R,5TH,KIN | 2.78 MI N OF I 70 | Steel Stringer/Multi-beam or girder (19 spans) | -- | 1969 | -- | 107.9 | 1959.1 | 65.4 | -- | 2515393 |
| NBI report | I-70 | OVER NS RR | 0.6 MI. W. OF I-270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 78.1 | 262.2 | 80.5 | -- | 2504081 |
| NBI report | HILLIARD-ROME RD S | HILLIARD ROME RD OVER 70 | 1.65 MI W OF IR270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | 2009 | 106.0 | 337.6 | 79.2 | -- | 2503999 |
| NBI report | I-70 | OVER IR 270 | 3.03 MI. W. OF I-670 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1970 | -- | 57.4 | 238.2 | 91.1 | -- | 2504200 |
| NBI report | HILLIARD-ROME RD N | HILLIARD ROME RD OVER 70 | 1.64 MI. W. OF I-270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | 2009 | 104.7 | 330.4 | 90.0 | -- | 2504022 |
| NBI report | SCHOOL WALK | UNDER SCHOOL WALK | 0.31 MI N OF I270 | Metal Arch - Thru | -- | 1970 | -- | 120.1 | 141.1 | 0.0 | -- | 2516535 |
| NBI report | I-270 | LT CD ROAD OVER IR 70 | 1.88 MI N OF SR317 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 111.9 | 372.1 | 89.8 | -- | 2514761 |
| NBI report | I-70 | OVER NS RR | 0.6 MI. W. OF I-270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 78.4 | 261.5 | 80.5 | -- | 2504057 |
| NBI report | I-70 | RT CD ROAD OVER IR 70 | 1.88 MI N OF SR317 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 115.2 | 371.7 | 92.9 | -- | 2514737 |
| NBI report | I270 | OVER RAMP 70EB TO 270NB | 0.19 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 53.2 | 149.9 | 88.3 | -- | 2514710 |
| NBI report | I-270 | OVER RAMP 70EB TO 270NB | 0.19 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 53.2 | 149.9 | 88.3 | -- | 2514702 |
| NBI report | 270 | OVER I-70 | 1.88 MI N OF SR317 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 111.9 | 372.1 | 92.5 | -- | 2514796 |
| NBI report | 270 | OVER I-70 | 1.88 MI N OF SR317 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 111.9 | 372.1 | 94.5 | -- | 2514826 |
| NBI report | 270NB TO 70EB RAMP | LT CD ROAD OVER RAMP | 0.19 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 53.2 | 149.9 | 95.0 | -- | 2514613 |
| NBI report | I-270 | OVER NS RR | 0.36 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 52.2 | 147.0 | 94.5 | -- | 2514583 |
| NBI report | I-270 | OVER NS RR | 0.36 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 55.1 | 147.3 | 89.3 | -- | 2514559 |
| NBI report | I-270 | RT CD ROAD OVER NS RR | 0.36 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 55.1 | 147.3 | 95.0 | -- | 2514524 |
| NBI report | I-270 | RT CD ROAD OVER RAMP | 0.19 MI S OF IR70 | Concrete Slab (3 spans) | -- | 1970 | -- | 56.1 | 150.3 | 85.6 | FO | 2514648 |
| NBI report | REFUGEE RD | BLACKLICK CR (REFUGEE RD | .8 MI E.OF LONG RD.INT. | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1970 | -- | 75.1 | 155.8 | 94.3 | -- | 2530732 |
| NBI report | I-70 WB | OVER RAMPS TO 70E & 270S | 0.12 MI. W. OF I-270 | Concrete Slab (4 spans) | -- | 1970 | -- | 49.9 | 179.1 | 82.8 | FO | 2504111 |
| NBI report | I-70 | OVER IR 270 | 3.03 MI W OF I-670 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1970 | -- | 57.4 | 238.2 | 91.1 | -- | 2504235 |
| NBI report | I-70 EB | OVER RAMPS TO 70E & 270S | 0.12 MI W. OF I-270 | Concrete Slab (4 spans) | -- | 1970 | -- | 49.9 | 179.1 | 85.0 | -- | 2504146 |
| NBI report | RAMP TO 270NB | IR 70 | 0.20 MI E OF I-270 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1970 | -- | 115.2 | 599.1 | 65.6 | SD | 2514850 |
| NBI report | US 23 | OVER SR 104 | OVER SR 104 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1970 | -- | 69.2 | 203.1 | 72.3 | FO | 2500590 |
| NBI report | PEDESTRIAN WALKWAY | MOTORIST PED WK W/WASH | 550 FT W/WASHINGTON AVE | Steel Stringer/Multi-beam or girder | -- | 1971 | -- | 50.9 | 64.0 | 0.0 | -- | 2561042 |
| NBI report | GRANDVIEW AVENUE | VIEW AVE (O) MCKINLEY AV | .36 MI W/CENTRAL AVENUE | Steel Stringer/Multi-beam or girder | -- | 1971 | -- | 108.9 | 114.2 | 77.2 | -- | 2561964 |
| NBI report | WHITTIER STREET | ER STREET(O)CONRAIL&CSX | 400 FT W/FRONT STREET | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1971 | -- | 125.0 | 278.9 | 81.3 | -- | 2560380 |
| NBI report | CSX RAILROAD | C&O RR E/KENNY | 850 FT E/KENNY ROAD | Steel Girder and floorbeam system | -- | 1971 | -- | 56.1 | 110.9 | 0.0 | -- | 2560216 |
| NBI report | PEDESTRIAN WALK | UNDER PEDESTRIAN WALK | 1.11 MI E OF US 23 | Steel Stringer/Multi-beam or girder | -- | 1971 | -- | 46.9 | 99.1 | 0.0 | -- | 2508885 |
| NBI report | GROVEPORT RD. | FRA 104 0971 | 0.9 MI E OF US 23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1971 | -- | 52.5 | 193.6 | 73.1 | FO | 2508850 |
| NBI report | SR 104 | OVER CSX RR AND PARSONS | 0.45 MI E OF US23 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1971 | -- | 141.4 | 794.7 | 76.0 | FO | 2508826 |
| NBI report | SR 104 | OVER SIXTH ST. | 0.32 MI E OF US23 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1971 | -- | 52.5 | 141.1 | 83.0 | -- | 2508796 |
| NBI report | FIFTH AVENUE | OVER SCIOTO RIVER | 350 FT W/DUBLIN ROAD | Prestressed Box beam or girders - Multiple (4 spans) | -- | 1972 | 1995 | 80.1 | 323.2 | 78.0 | -- | 2560771 |
| NBI report | I-70 | OVER HARPER RD | 0.24 MI E. OF I-670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 50.9 | 131.9 | 93.5 | -- | 2504510 |
| NBI report | I-70 | OVER HARPER RD | 0.24 MI E. OF I-670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 56.1 | 159.1 | 92.5 | -- | 2504529 |
| NBI report | SR-315 | RAMP TO SR-315NB | 3.48 MI N OF N I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 69.9 | 187.0 | 82.7 | -- | 2515423 |
| NBI report | HAGUE AVE | DRY RUN DITCH (HAGUE) | 0.1 MI NORTH OF FISHER RD | Concrete Culvert (2 spans) | -- | 1972 | -- | 12.1 | 32.2 | 78.3 | -- | 2531763 |
| NBI report | GENDER RD | BLACKLICK CREEK (GENDER) | 0.5 MI SOUTH OF REFUGEE | Concrete Slab (3 spans) | -- | 1972 | -- | 49.9 | 141.1 | 92.7 | -- | 2532263 |
| NBI report | KIMBERLY PARKWAY | MASON RUN E/COURTRHT | 300 FT E/COURTRIGHT ROAD | Prestressed Box beam or girders - Multiple | -- | 1972 | -- | 31.2 | 32.2 | 98.9 | -- | 2560283 |
| NBI report | SR104 | OVER AM.AGGREGATE RD. | 0.45 MI W OF US 23 | Concrete Slab (3 spans) | -- | 1972 | -- | 44.0 | 115.5 | 83.0 | -- | 2508761 |
| NBI report | GRANDVIEW AVE | I-670 | 0.95 MI E OF I70 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1972 | 2003 | 122.1 | 238.5 | 91.7 | -- | 2504391 |
| NBI report | GENDER RD | NORFOLK SO RR (GENDER) | 0.3 MI NORTH OF REFUGEE | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1972 | -- | 52.2 | 146.0 | 94.0 | -- | 2533073 |
| NBI report | SR 315 | OVER ACKERMAN RD | 5.17 MI N OF S70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1972 | -- | 57.1 | 186.0 | 93.0 | -- | 2515636 |
| NBI report | SR 315 | OVER LANE AVE | 4.32 MI N OF I70 | Steel Stringer/Multi-beam or girder | -- | 1972 | -- | 87.9 | 92.2 | 93.0 | -- | 2515571 |
| NBI report | SR 315 | OVER WOODY HAYES DRIVE | 4.15 MI N OF I70 | Concrete Slab (4 spans) | -- | 1972 | -- | 43.0 | 157.2 | 74.2 | -- | 2515512 |
| NBI report | SR 315 | OVER OLENTANGY RIVER ROA | 3.65 MI N OF I70 | Concrete Slab (3 spans) | -- | 1972 | -- | 40.0 | 105.6 | 82.7 | -- | 2515458 |
| NBI report | SR 104 | SCIOTO RIVER | 0.79 MI W OF US23 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1972 | -- | 104.0 | 689.0 | 85.0 | -- | 2508737 |
| NBI report | HARRISON RD | IR 70 | 0.21 MI W. OF IR670 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1972 | -- | 145.7 | 410.5 | 86.9 | FO | 2504324 |
| NBI report | I.R. 670 | IR-670 OV. IR-70WB | 0.65 MI W OF US33 | Steel Stringer/Multi-beam or girder | -- | 1972 | -- | 85.3 | 92.5 | 83.2 | FO | 2504340 |
| NBI report | I.R. 670 | OVER MCKINLEY AVENUE | 0.22 MI E OF I70 | Steel Stringer/Multi-beam or girder | -- | 1972 | -- | 119.1 | 127.0 | 85.5 | -- | 2504367 |
| NBI report | I.R.670 | OVER SCIOTO R, US33, RR | 0.31 MI E OF I70 | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1972 | -- | 133.9 | 822.9 | 81.6 | FO | 2504375 |
| NBI report | SCARBOROUGH BLVD | DITCH W/BRICE RD | 700 FT W/BRICE ROAD | Prestressed Box beam or girders - Multiple | -- | 1972 | -- | 41.0 | 43.0 | 96.6 | -- | 2560348 |
| NBI report | SR 315 | OVER OLENTANGY RIVER ROA | 3.65 MI N OF I70 | Concrete Slab (3 spans) | -- | 1972 | -- | 40.0 | 105.6 | 78.0 | -- | 2515482 |
| NBI report | MAIN ST (US40) | OVER I-270 | 1.7 MI E OF SR317 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1972 | -- | 81.0 | 395.7 | 89.0 | FO | 2502844 |
| NBI report | LIVINGSTON | IR 270 | 0.69 MI N OF IR70 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1972 | -- | 79.4 | 390.1 | 69.4 | FO | 2512114 |
| NBI report | SR40 | OVER STATEHOUSE UNDERPAS | 1.07 MI E OF SR315 | Concrete Frame (3 spans) | -- | 1972 | -- | 16.1 | 47.9 | 98.0 | -- | 2502607 |
| NBI report | I-70 | OVER NS RR | 0.7 MI. E. OF IR670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 112.2 | 297.3 | 91.1 | -- | 2504545 |
| NBI report | SR 3 | OVER SR-3 | 1.15 MI W OF SR 270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1973 | 2002 | 77.1 | 193.9 | 94.2 | -- | 2509105 |
| NBI report | SR 161 | ALUM CREEK | 0.66 MI W OF SR270 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | 2006 | 63.7 | 196.2 | 96.3 | -- | 2509091 |
| NBI report | WILSON RD | WILSON RD OVER I70 | 1.04 MI E OF I-270 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1973 | 2005 | 117.1 | 367.8 | 93.3 | -- | 2504308 |
| NBI report | TRABUE RD | PRIVATE ROAD (TRABUE RD) | 0.1 MI WEST OF U.S.33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 59.1 | 152.9 | 84.5 | -- | 2534258 |
| NBI report | SR 317 | BIG WALNUT CREEK | 0.53 MI N OF 5TH AVE. | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 63.0 | 240.8 | 96.9 | -- | 2516632 |
| NBI report | I-270 | RAMP P OVR MORRISON RD E | 0.17 MI N OF SR16 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 53.2 | 143.1 | 91.9 | -- | 2511967 |
| NBI report | CHERRY CREEK PKWY | OVER SCIOTO BIG RUN | .26 MI S/OLD SULLIVANT AV | Prestressed Box beam or girders - Multiple | -- | 1973 | -- | 24.0 | 24.9 | 75.9 | -- | 2560135 |
| NBI report | TRABUE RD | SCIOTO RIVER (TRABUE) | 0.3 MI WEST OF U.S. 33 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 108.9 | 416.0 | 71.8 | -- | 2530309 |
| NBI report | I-70 | DRY RUN | 0.74 MI E OF I-670 | Steel Culvert | -- | 1973 | -- | 15.1 | 23.0 | 74.7 | -- | 2504553 |
| NBI report | HARDY PARKWAY ST | PARKWAY ST (O) SCIOTO BI | .37 MI S/FRANK ROAD | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1973 | -- | 24.9 | 78.1 | 97.6 | -- | 2560356 |
| NBI report | IR-70 | OVER US40 (BROAD ST) | 1.28 MI. E. OF IR670 | Steel Stringer/Multi-beam or girder | -- | 1973 | -- | 111.9 | 120.1 | 88.6 | -- | 2504588 |
| NBI report | GREENLAWN AVE | SCIOTO RIVER (GREENLAWN) | 0.2 MI WEST OF HIGH ST | Steel Stringer/Multi-beam or girder (10 spans) | -- | 1974 | 2007 | 126.0 | 836.0 | 93.9 | -- | 2531755 |
| NBI report | BROAD STRET US16 | OVER I-270 | 0.63 S OF CONRAIL R R | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1974 | -- | 94.2 | 395.0 | 83.0 | -- | 2500353 |
| NBI report | I-70L | OVER SOUDER AVE | 0.84 MI. E. OF US62 | Prestressed Stringer/Multi-beam or girder | -- | 1974 | -- | 64.3 | 67.6 | 91.1 | -- | 2504669 |
| NBI report | I-70 | OVER SOUDER AVE | 0.84 MI. E. OF US62 | Prestressed Stringer/Multi-beam or girder | -- | 1974 | -- | 64.3 | 67.6 | 85.8 | -- | 2504642 |
| NBI report | I-270 | OVER SR 16 | 0.08 MI S. OF IR270 | Concrete Slab (4 spans) | -- | 1974 | -- | 45.6 | 166.0 | 93.5 | FO | 2512076 |
| NBI report | I-70 | 70WB OVER SCIOTO RIVER | 0.21 MI E OF I-71 | Steel Stringer/Multi-beam or girder (9 spans) | -- | 1974 | -- | 113.2 | 897.4 | 72.0 | -- | 2504413 |
| NBI report | PED. WALK | UNDER PEDESTRIAN OVERPAS | 0.84 MI S OF SR161 | Prestressed Box beam or girders - Multiple | -- | 1974 | -- | 84.6 | 174.5 | 0.0 | -- | 2508230 |
| NBI report | RAMP TO 270SB | IR 270 | 0.09 MI N OF SR16 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1974 | -- | 82.0 | 344.2 | 92.1 | -- | 2512017 |
| NBI report | I-70 | OVER CYPRESS AVE | 0.5 MI. E. OF US 62 | Concrete Slab (3 spans) | -- | 1974 | -- | 44.0 | 109.6 | 86.2 | -- | 2504634 |
| NBI report | I-70 | OVER GLENWOOD AVE | 0.43 MI E OF US62 | Concrete Slab (3 spans) | -- | 1974 | -- | 52.2 | 126.0 | 85.0 | -- | 2504618 |
| NBI report | CHANTRY DRIVE | DITCH W/BRICE ROAD | 850 FT W/BRICE ROAD | Prestressed Box beam or girders - Multiple | -- | 1974 | -- | 42.0 | 43.0 | 99.6 | -- | 2560208 |
| NBI report | I-70 | OVER 315 AND RAMPS | 1.03 MI E OF US62 | Steel Stringer/Multi-beam or girder (9 spans) | -- | 1974 | -- | 110.9 | 706.7 | 88.2 | FO | 2504677 |
| NBI report | HIGHBANKS PARK RD | STREAM | 0.5 MILES FROM PARK ENTR | Concrete Slab (3 spans) | -- | 1975 | -- | 18.0 | 45.9 | 89.2 | -- | 2581175 |
| NBI report | I-70 | OVER CSX RR | 0.07 MI E OF US62 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1975 | -- | 83.0 | 221.1 | 89.9 | -- | 2504731 |
| NBI report | CSX RAILROAD | C&O E/KENNY RD | .3 MI E/KENNY ROAD | Steel Stringer/Multi-beam or girder | -- | 1975 | -- | 46.9 | 101.1 | 0.0 | -- | 2560453 |
| NBI report | I-70 | RMP(70WB TO 315NB)OVNB31 | 0.33 MI N OF S 70 | Steel Stringer/Multi-beam or girder | -- | 1975 | -- | 95.1 | 105.0 | 88.9 | FO | 2514893 |
| NBI report | HIGHBANKS PARK RD | STREAM | 0.25 MILES FROM PARK ENTR | Concrete Slab (3 spans) | -- | 1975 | -- | 22.0 | 60.0 | 89.2 | -- | 2581221 |
| NBI report | I-70 | OVER US 62 (CENTRAL AVE) | 0.77 MI E OF US40 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1975 | -- | 98.1 | 260.5 | 89.9 | -- | 2504723 |
| NBI report | S.R.315 | RMP(71NB TO 70WB)OV SR31 | 0.24 MI N OF I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1975 | -- | 86.9 | 240.5 | 85.1 | FO | 2504790 |
| NBI report | S.R.3 | KILBOURNE RUN | 6.37 MI. N. OF I71 | Concrete Slab (3 spans) | -- | 1975 | -- | 23.6 | 64.6 | 97.6 | -- | 2500191 |
| NBI report | GENDER RD | GEORGES CREEK (GENDER) | 0.1 MI SOUTH OF LEHMAN RD | Prestressed Box beam or girders - Multiple | -- | 1975 | -- | 55.1 | 59.1 | 89.3 | -- | 2534002 |
| NBI report | I-70 | OVER 315 AND RAMPS | 1.03 MI E OF US62 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1975 | -- | 118.1 | 539.7 | 91.1 | -- | 2504766 |
| NBI report | FISHER RD | IR 270 | 0.4 MI S OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1975 | -- | 106.6 | 341.2 | 87.8 | FO | 2512130 |
| NBI report | OVER RAMP MOUND | OVER RAMP TO MOUND ST | 0.25 MI E OF US62 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1975 | -- | 60.0 | 161.1 | 89.7 | -- | 2504758 |
| NBI report | UNDER I-70 | OVER STATE SCHOOL ACCESS | 1.56 E. OF IR 670 | Concrete Culvert | -- | 1975 | -- | 25.9 | 28.9 | 62.4 | FO | 2504693 |
| NBI report | PETZINGER ROAD | MASON RUN E/COURTRIGHT | 825 FT E/COURTRIGHT ROAD | Prestressed Box beam or girders - Multiple | -- | 1975 | -- | 32.2 | 33.1 | 95.1 | -- | 2560364 |
| NBI report | PEDESTRIAN WALK | UNDER PEDESTRIAN WALK | 7.44 MI N OF I70 | Steel Stringer/Multi-beam or girder | -- | 1975 | -- | 122.1 | 558.1 | 0.0 | -- | 2515679 |
| NBI report | WHITTIER ST | IR 70 | 1.45 MI E OF US 62 | Steel Stringer/Multi-beam or girder (2 spans) | Closed | 1975 | -- | 131.9 | 272.7 | 36.0 | SD | 2504464 |
| NBI report | I-70 | OVER SULLIVANT AVE | 0.57 MI E OF US40 | Prestressed Stringer/Multi-beam or girder | -- | 1975 | -- | 62.0 | 67.6 | 87.7 | -- | 2504707 |
| NBI report | I-70 | RAMP F OVER SULLIVANT AV | 0.58 MI E OF US40 | Prestressed Stringer/Multi-beam or girder | -- | 1975 | -- | 58.4 | 63.0 | 86.1 | -- | 2504715 |
| NBI report | I-71 | SB71 UNDER 70 & OVER 315 | 4.51 MI N OF I270 | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1975 | -- | 124.0 | 579.8 | 71.2 | FO | 2507579 |
| NBI report | SR 315 | OVER HENDERSON RD | 7.77 MI N OF S70 | Steel Stringer/Multi-beam or girder | -- | 1975 | -- | 83.0 | 89.9 | 88.6 | -- | 2515717 |
| NBI report | DEMOREST RD | BIG RUN(DEMOREST) | 0.1 MI SOUTH OF CLIME RD | Prestressed Box beam or girders - Multiple | -- | 1976 | -- | 100.1 | 104.0 | 74.0 | -- | 2534037 |
| NBI report | WESTBELT DRIVE | STREAM N/TRABUE RD | .36 MI N/TRABUE ROAD | Concrete Culvert (2 spans) | -- | 1976 | -- | 10.2 | 24.9 | 100.0 | -- | 2561867 |
| NBI report | NS RAILROAD | N&W RR E/STR | 300 FT W/I-71 | Steel Stringer/Multi-beam or girder | -- | 1976 | -- | 44.9 | 98.1 | 0.0 | -- | 2560437 |
| NBI report | GROVES ROAD | CARR DIT W/HAMILTON RD | 400 FT W/HAMILTON RD | Concrete Culvert (2 spans) | -- | 1976 | -- | 9.8 | 24.9 | 99.1 | -- | 2562022 |
| NBI report | HENDERSON RD | OLENT.RIVER (HENDERSON) | 0.2 MI E.OF OLENT.RIV.RD | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1976 | 2009 | 80.1 | 246.1 | 88.9 | -- | 2534282 |
| NBI report | CONRAIL RAILROAD | CONRAIL W/STR | 400 FT W/I-71 | Steel Girder and floorbeam system | -- | 1976 | -- | 45.9 | 97.1 | 0.0 | -- | 2560429 |
| NBI report | PEDEST. OVERPASS | UNDER PEDESTRIAN OVERPAS | 0.37 MI N OF MAIN ST. | Steel Frame | -- | 1976 | -- | 105.0 | 496.1 | 0.0 | -- | 2500647 |
| NBI report | NS RAILOAD | N&W W/ALUM CR DR | .2 MI W/ALUM CREEK DRIVE | Steel Stringer/Multi-beam or girder | -- | 1976 | -- | 61.0 | 64.0 | 0.0 | -- | 2560720 |
| NBI report | PEDESTRIAN WALKWAY | UNDER C&SOE PED WALK | 100 FT N/SPRING STREET | Steel Stringer/Multi-beam or girder | -- | 1977 | -- | 36.1 | 37.1 | 0.0 | -- | 2561247 |
| NBI report | MACLAM DRIVE | DRY RUN #1 N/FISHER ROAD | 150 FT N/FISHER ROAD | Concrete Culvert (2 spans) | -- | 1977 | -- | 10.2 | 22.0 | 90.3 | -- | 2560534 |
| NBI report | JOHN HERRICK DRIVE | OLENTANGY RIVER | OVER OLENTANGY RIVER | Prestressed Box beam or girders - Multiple (4 spans) | -- | 1978 | -- | 94.2 | 370.1 | 67.7 | -- | 2590018 |
| NBI report | PEDESTRIAN WALKWAY | MUN CT PED WK N/FULTON | 100 FT N/FULTON STREET | Steel Truss - Thru | -- | 1978 | -- | 170.0 | 170.0 | 0.0 | -- | 2561093 |
| NBI report | S.R.315 | OVER PARK ACCESS ROAD | 2.16 MI S OF S 270 | Concrete Slab (3 spans) | -- | 1979 | -- | 41.0 | 110.9 | 80.3 | FO | 2515830 |
| NBI report | US 23D | OVER NATIONWIDE BLVD. | 0.48 MI N OF SR 670 | Concrete Slab (4 spans) | -- | 1979 | -- | 56.1 | 202.1 | 92.3 | -- | 2500833 |
| NBI report | HIGH STREET | CONRAIL N/NATIONWIDE | 400 FT N/NATIONWIDE BLVD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1979 | -- | 107.9 | 361.9 | 94.6 | FO | 2560704 |
| NBI report | PEDESTRIAN WALKWAY | UNDER BATTELLE PED WALK | .23 MI E/OLENTANGY RIVER | Steel Stringer/Multi-beam or girder | -- | 1979 | -- | 73.2 | 118.1 | 0.0 | -- | 2560658 |
| NBI report | BETHEL RD | SR315 | 3.44 MI S OF I270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1979 | -- | 96.1 | 229.0 | 83.0 | FO | 2515741 |
| NBI report | PEDESTRIAN WALKWAY | UNDER NATIONWIDE PED WAL | 550 FT N/SPRING STREET | Steel Stringer/Multi-beam or girder | -- | 1979 | -- | 90.9 | 171.9 | 0.0 | -- | 2561913 |
| NBI report | NATIONWIDE BLVD | CONRAIL W/HIGH ST | 200 FT W/HIGH STREET | Steel Stringer/Multi-beam or girder | -- | 1979 | -- | 48.9 | 55.1 | 96.4 | -- | 2560755 |
| NBI report | S.R.315 | OVER PARK ACCESS ROAD | 2.16 MI S OF I270 | Concrete Slab (3 spans) | -- | 1979 | -- | 41.0 | 110.9 | 80.3 | FO | 2515822 |
| NBI report | PEDESTRIAN WALKWAY | PEDWK S/NATIONWIDE | 100 FT S/NATIONWIDE BLVD | Steel Truss - Thru | -- | 1980 | -- | 105.0 | 121.1 | 0.0 | -- | 2560917 |
| NBI report | MELP ENTRANCE | BIG RUN E/SR 104 | 200 FT E/STATE ROUTE 104 | Concrete Slab (3 spans) | -- | 1980 | -- | 31.2 | 83.0 | 87.0 | FO | 2560984 |
| NBI report | PEDESTRIAN WALKWAY | PEDWK E/HIGH ST | 200 FT E/HIGH STREET | Steel Truss - Thru | -- | 1980 | -- | 210.0 | 309.1 | 0.0 | -- | 2560909 |
| NBI report | OHIO CENTER WAY | CONRAIL N STR 1 E/HIGH S | CONV CENTR N STR 1 E/HIGH | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1980 | -- | 90.9 | 209.0 | 87.4 | FO | 2563169 |
| NBI report | OHIO CENTER WAY | CONRAIL N STR 1 W/3RD ST | CONV CENTR N STR 1 W/3RD | Steel Stringer/Multi-beam or girder (8 spans) | -- | 1980 | -- | 116.1 | 997.1 | 89.4 | -- | 2563177 |
| NBI report | AIRPORT RUNWAY | UNDER AIRPORT TAXI #1WHA | .63 MI W/HAMILTON ROAD | Steel Arch - Deck | -- | 1980 | -- | 35.1 | 35.1 | 0.0 | -- | 2560763 |
| NBI report | REFUGEE RD | POWELL DITCH(REFUGEE RD) | 0.1 MI WEST OF BRICE RD | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1980 | -- | 20.0 | 62.0 | 94.8 | -- | 2534193 |
| NBI report | AGLER RD | ALUM CREEK (AGLER ROAD ) | JUST WEST OF SUNBURY RD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1980 | -- | 140.1 | 519.1 | 79.9 | -- | 2534150 |
| NBI report | AIRPORT RUNWAY | UNDER AIRPORT TAXI #2WHA | .83 MI W/HAMILTON ROAD | Steel Arch - Deck | -- | 1980 | -- | 35.1 | 35.1 | 0.0 | -- | 2560836 |
| NBI report | OHIO CENTER WAY | CONRAIL #1 TURN W/3RD ST | CONV CENTR #1 TURN W/3RD | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1980 | -- | 35.1 | 66.9 | 98.0 | -- | 2563150 |
| NBI report | WARNER RD | ROCKY FORK (WARNER) | 0.35 MI WEST OF HARLEM RD | Prestressed Box beam or girders - Multiple | -- | 1980 | -- | 65.0 | 67.9 | 97.0 | -- | 2562464 |
| NBI report | SR 315 | OVER OLENTANGY RIVER ROA | 6.17 MI N OF I70 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1980 | -- | 65.9 | 132.9 | 83.0 | -- | 2515539 |
| NBI report | 315NB | RAMP(315NB TO W.N.BRODWY | 5.91 MI N OF I70 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1980 | -- | 63.7 | 172.6 | 83.0 | -- | 2515520 |
| NBI report | SR 315 | OVER OLENTANGY RIVER ROA | 6.17 MI N OF I70 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1980 | -- | 65.9 | 132.9 | 83.0 | -- | 2515555 |
| NBI report | SR 315 | OVER WEST N.BROADWAY | 6.29 MI N OF I70 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1980 | -- | 97.1 | 195.9 | 83.0 | -- | 2515563 |
| NBI report | OHIO CENTER WAY | CONRAIL S STR 1 E/HIGH S | CONV CENTR S STR 1 E/HIGH | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1980 | -- | 111.9 | 256.9 | 91.4 | -- | 2563118 |
| NBI report | OHIO CENTER WAY | CONRAIL S STR 1 W/3RD ST | CONV CENTR S STR 1 W/3RD | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1980 | -- | 116.1 | 618.1 | 91.4 | -- | 2563126 |
| NBI report | OHIO CENTER WAY | CONRAIL #1 TURN E/HIGH S | CONV CENTR #1 TURN E/HIGH | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1980 | -- | 44.0 | 66.9 | 98.0 | -- | 2563134 |
| NBI report | PEDESTRIAN WALKWAY | GRANGE PED WK S/SYCAMR | 200 FT S/SYCAMORE STREET | Steel Frame | -- | 1980 | -- | 85.0 | 184.1 | 0.0 | -- | 2561085 |
| NBI report | TRABUE RD | TRIBUTARY (TRABUE ROAD) | 0.4 MI WEST OF HAGUE AVE | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1981 | -- | 22.0 | 73.2 | 90.4 | -- | 2534428 |
| NBI report | PED WALKWAY | UNDER AEP PED WALK | 0.28 MI W OF HIGH ST | Steel Stringer/Multi-beam or girder | -- | 1983 | -- | 127.0 | 150.9 | 0.0 | -- | 2501546 |
| NBI report | PEDESTRIAN WALKWAY | UNDER GRANT HOSP PED WAL | 150 FT W/GRANT AVENUE | Steel Truss - Deck | -- | 1983 | -- | 99.1 | 149.9 | 0.0 | -- | 2563088 |
| NBI report | INNISWOOD PARK RD | STREAM | ENTRANCE TO PARK | Prestressed Stringer/Multi-beam or girder | -- | 1983 | -- | 44.9 | 44.9 | 87.3 | -- | 2581124 |
| NBI report | CHERRY BOTTOM RD | TRAPPE DITCH(CHERRY BOT) | 0.5 MI NORTH OF MORSE RD | Concrete Slab (3 spans) | -- | 1983 | -- | 27.9 | 77.1 | 92.6 | -- | 2534363 |
| NBI report | CENTRAL COLLEGE RD | ROCKY FORK(CENT.COLLEGE) | 0.3 MI WEST OF HARLEM RD | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1983 | -- | 24.9 | 82.0 | 99.8 | -- | 2534614 |
| NBI report | HAYDEN RUN RD | SCIOTO RIVER(HAYDEN RUN) | JUST WEST OF U.S.33 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1984 | -- | 222.1 | 800.9 | 70.1 | -- | 2534681 |
| NBI report | PEDESTRIAN WALKWAY | (U) LEVEQUE PED WKWY | 50 FT N/BROAD STREET | Steel Girder and floorbeam system | -- | 1986 | -- | 37.1 | 40.0 | 0.0 | -- | 2562162 |
| NBI report | I.R. 670 | US-62 | 1.93 MI W OF IR270 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1986 | -- | 120.1 | 418.7 | 91.0 | -- | 2503344 |
| NBI report | SR 104 | ALUM CREEK | 0.4 MI W OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1986 | -- | 97.1 | 258.9 | 88.3 | -- | 2508931 |
| NBI report | ALUM CREEK DRIVE | SR-104 | 0.69 MI W OF US 33 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1986 | -- | 108.9 | 240.2 | 88.3 | FO | 2508923 |
| NBI report | SR 104 | OVER NS RR (OLD N&W) | 2.27 MI E OF US 23 | Concrete Culvert | -- | 1987 | -- | 27.9 | 34.5 | 76.9 | -- | 2508915 |
| NBI report | SR 104 | OVER LOCKBOURNE ROAD | 1.61 MI N OF US23 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1987 | -- | 81.0 | 165.0 | 92.1 | -- | 2508893 |
| NBI report | FIFTH AVE. | ALUM CREEK (FIFTH AVE) | JUST EAST OF I-670 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1987 | -- | 69.9 | 185.0 | 90.1 | -- | 2535610 |
| NBI report | CONRAIL RAILROAD | CONRAIL S/FISHER RD | 500 FT S/FISHER ROAD | Steel Stringer/Multi-beam or girder | -- | 1987 | -- | 43.0 | 91.9 | 0.0 | -- | 2562510 |
| NBI report | PEDESTRIAN WALKWAY | UNDER LEVEQUE PED WALKWA | 250 FT E/FRONT STREET | Concrete Girder and floorbeam system | -- | 1987 | -- | 34.1 | 34.1 | 0.0 | -- | 2562170 |
| NBI report | SR 104 | OVER NS RR (OLD N&W) | 2.57 MI E OF US23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1987 | -- | 131.9 | 477.1 | 97.1 | -- | 2508982 |
| NBI report | SR 104 | OVER NS RR (OLD N&W) | 2.57 MI E OF US23 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1987 | -- | 110.9 | 477.1 | 97.1 | -- | 2508974 |
| NBI report | SR 104 | OVER FAIRWOOD AVENUE | 2.12 MI E OF US 23 | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1987 | -- | 42.7 | 110.6 | 94.3 | -- | 2508907 |
| NBI report | U.S.R. 62 | UNDER CSX RR | 3.2 MI S OF SR270 | Steel Girder and floorbeam system | -- | 1988 | -- | 63.7 | 71.2 | 0.0 | -- | 2503239 |
| NBI report | SR 317 | BIG WALNUT CREEK | 0.37 MI E OF US23 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1988 | -- | 112.9 | 405.9 | 95.9 | -- | 2516217 |
| NBI report | STELZER ROAD | EAST FIFTH AVENUE | 650 FT S/SEVENTH AVENUE | Prestressed Stringer/Multi-beam or girder | -- | 1988 | -- | 70.9 | 76.1 | 97.0 | -- | 2562197 |
| NBI report | FISHINGER RD | SCIOTO RIVER (FISHINGER) | JUST WEST OF U.S. 33 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1988 | -- | 210.0 | 699.2 | 92.6 | -- | 2534991 |
| NBI report | MORSE RD | ROCKY FORK CREEK (MORSE) | JUST EAST OF U.S. 62 | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1988 | 2007 | 49.9 | 126.0 | 96.3 | -- | 2535017 |
| NBI report | I.R.670 | ALUM CREEK | 2.6 MI W OF IR270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1988 | -- | 129.9 | 337.9 | 85.0 | -- | 2517876 |
| NBI report | PEDESTRIAN MALLWAY | CITY CTR MALLWAY N/TOWN | 100 FT N/TOWN STREET | Steel Truss - Thru | -- | 1989 | -- | 86.0 | 97.1 | 0.0 | -- | 2562596 |
| NBI report | TUTTLE ROAD | I-270 | 1.66 MI S OF US33 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1989 | -- | 119.1 | 240.2 | 88.8 | FO | 2510154 |
| NBI report | FIFTH AVENUE | OVER I-670 | 2.88 MI W OF IR270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1989 | -- | 113.5 | 229.0 | 83.1 | -- | 2517841 |
| NBI report | ARROWSMITH DRIVE | N/CREIGHTON PLACE | 50 FT N/CREIGHTON PLACE | Concrete Culvert | -- | 1989 | -- | 20.0 | 22.0 | 100.0 | -- | 2562413 |
| NBI report | LEONARD AVENUE | I-670 | 3.99 MI W OF IR270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1989 | -- | 108.3 | 217.9 | 92.0 | FO | 2517760 |
| NBI report | OVERBROOK DRIVE | ADENA BROOK #2 E/HIGH ST | .36 MI E/HIGH STREET | Prestressed Box beam or girders - Multiple | -- | 1990 | -- | 27.9 | 28.9 | 80.8 | FO | 2562634 |
| NBI report | PEDESTRIAN WALKWAY | PED WALKWAY N/SPRING ST | 200 FT N/SPRING STREET | Steel Truss - Thru | -- | 1990 | -- | 100.1 | 164.1 | 0.0 | -- | 2562626 |
| NBI report | LEONARD AVENUE | CONRAIL S/I-670 | 400 FT S/I-670 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1990 | -- | 65.0 | 138.1 | 96.2 | -- | 2562898 |
| NBI report | I.R.670 | I-670 | 3.72 MI W OF IR270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1990 | -- | 136.5 | 408.8 | 75.8 | FO | 2517744 |
| NBI report | PEDESTRIAN WALKWAY | STREET (U) PEDESTRIAN WK | 400 FT E/HIGH STREET | Steel Girder and floorbeam system | -- | 1990 | -- | 79.1 | 88.9 | 0.0 | -- | 2562707 |
| NBI report | PEDESTRIAN WALKWAY | PED WALKWAY E/HIGH STREE | 350 FT E/HIGH STREET | Steel Truss - Thru | -- | 1990 | -- | 34.1 | 34.1 | 0.0 | -- | 2562774 |
| NBI report | PEDESTRIAN WALKWAY | PED WALKWAY N/FULTON ST | 150 FT S/MOUND STREET | Steel Truss - Thru | -- | 1990 | -- | 82.0 | 85.0 | 0.0 | -- | 2562723 |
| NBI report | SR750 (POLARIS PW) | MIA RUN | EAST OF SANCUS BLVD | Concrete Culvert | -- | 1991 | -- | 20.0 | 20.0 | 11.0 | FO | 2104253 |
| NBI report | WALCUTT ROAD | MILLIKEN DIT N/ROBERTS R | .26 MI N/ROBERTS ROAD | Concrete Culvert | -- | 1991 | -- | 20.0 | 22.0 | 99.3 | -- | 2560038 |
| NBI report | I-670 | OVER US-62 (NELSON ROAD) | 3.29 MI W OF IR270 | Steel Stringer/Multi-beam or girder | -- | 1991 | -- | 61.7 | 67.3 | 85.0 | -- | 2517809 |
| NBI report | CSX RAILROAD | L ROAD (U) CSX RAILROAD | 100 FT E/KENNY ROAD | Prestressed Box beam or girders - Multiple | -- | 1991 | -- | 47.9 | 112.9 | 0.0 | -- | 2562146 |
| NBI report | CALUMET STREET | WALHALLA RAVINE N/WEBER | 300 FT N/WEBER ROAD | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 123.0 | 277.9 | 63.0 | -- | 2562561 |
| NBI report | I-670 | I670 | 3.93 MI E OF IR70 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1991 | -- | 111.2 | 226.7 | 96.5 | -- | 2517698 |
| NBI report | SR-16 | SLATE RIDGE RUN | 3.13 MI W OF I-270 | Concrete Culvert (2 spans) | -- | 1991 | -- | 9.8 | 26.2 | 71.0 | -- | 2500469 |
| NBI report Bridgehunter | USR 40 | SCIOTO RIVER (BROAD ST.) | 0.68MI E OF SR315 | Concrete Other (5 spans) | -- | 1992 | -- | 164.1 | 672.9 | 77.1 | FO | 2502577 |
| NBI report | JOYCE AVENUE | AVE (0) CONRAIL/CSX/NS R | 100 FT N/I-670 | Steel Stringer/Multi-beam or girder | -- | 1992 | -- | 84.0 | 88.9 | 80.4 | FO | 2562952 |
| NBI report | SR 3 | OVER I-670 | 0.88 MI. S. OF IR 71 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1992 | -- | 138.1 | 276.3 | 77.9 | FO | 2500051 |
| NBI report | JOYCE AVENUE | AVE (O) NS RAILROAD | 1600 FT N/5TH AVENUE | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1992 | -- | 87.9 | 784.2 | 80.4 | -- | 2560798 |
| NBI report | SR 3 | OVER NS RR | 0.88 MILE SOUTH OF IR 71 | Steel Stringer/Multi-beam or girder | -- | 1992 | -- | 108.9 | 112.9 | 82.0 | -- | 2500078 |
| NBI report | POLARIS PKW | OVER I-71 | 4.86 MI S OF US36 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1992 | -- | 133.9 | 270.0 | 82.4 | FO | 2102277 |
| NBI report | IR 670 | OVER CSX & NS RR | 1.22 MI E OF IR71 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1992 | -- | 153.9 | 378.0 | 85.0 | -- | 2517728 |
| NBI report | SR 104 | BIG RUN | 1.22 MI N OF SR270 | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1992 | -- | 29.9 | 94.5 | 96.2 | -- | 2508680 |
| NBI report | I 71 | OVER WORTHINGTON-GALENA | 1.69 MI N OF I-270 | Concrete Slab (3 spans) | -- | 1992 | 2001 | 53.2 | 138.1 | 90.1 | -- | 2508419 |
| NBI report | IR 71 | OVER WORTHINGTON-GALENA | 1.69 MI N OF I 270 | Concrete Slab (3 spans) | -- | 1992 | 2005 | 52.5 | 138.1 | 91.3 | -- | 2508427 |
| NBI report | BOWEN RD | GEORGES CREEK (BOWEN) | JUST SOUTH OF WRIGHT RD | Concrete Slab (3 spans) | -- | 1992 | -- | 27.9 | 75.1 | 99.8 | -- | 2535327 |
| NBI report | ST CLAIR AVENUE | I-670 | 0.24 MI. E. OF IR71 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1992 | -- | 153.9 | 534.5 | 78.0 | FO | 2517566 |
| NBI report | I-670 EB/WB | OVER CSX/NS RR | .25 EAST OF US23 OVER RR | Steel Stringer/Multi-beam or girder | -- | 1993 | -- | 186.0 | 197.2 | 79.0 | FO | 2517779 |
| NBI report | OHIO CENTER WAY | CONRAIL #2 TURN W/3RD | 750 FT W/THIRD STREET | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1993 | -- | 35.1 | 66.9 | 88.2 | -- | 2563207 |
| NBI report | IR 670 | RAMP B:71S TO 670 E | 0.43 MI S OF 5TH AVE | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1993 | -- | 138.1 | 358.9 | 63.2 | -- | 2517671 |
| NBI report | N. THIRD ST(US23D) | RAMP 670WB-23DSB O NS RR | OVER CONV CTR CONN & NSRR | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1993 | -- | 95.1 | 467.9 | 91.2 | FO | 2500868 |
| NBI report | NEWELL DRIVE | DITCH E/WILSON ROAD | 800 FT E/WILSON ROAD | Concrete Culvert | -- | 1993 | -- | 25.9 | 27.9 | 100.0 | -- | 2562847 |
| NBI report | GREENSWARD ROAD | SUGAR RUN S/SR 161 | 1300 FT S/SR 161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1993 | -- | 44.9 | 95.1 | 87.7 | -- | 2561115 |
| NBI report | OHIO CENTER WAY | CONRAIL #2 TURN E/HIGH S | 277' E/HIGH STREET | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1993 | -- | 44.9 | 66.9 | 88.2 | -- | 2563223 |
| NBI report | IR670 | RAMP TO 670EB OVER NS RR | 0.53 MI N OF US 40 | Steel Stringer/Multi-beam or girder | -- | 1993 | -- | 120.1 | 129.6 | 92.9 | FO | 2506149 |
| NBI report | IR71 | OVER CSX & NS RR | 0.42 MI S OF 5TH AVE | Steel Stringer/Multi-beam or girder | -- | 1993 | -- | 126.0 | 133.9 | 85.0 | -- | 2507811 |
| NBI report | IR71 | OVER SECOND AVE | 0.31 MI S OF 5TH AVE | Prestressed Box beam or girders - Multiple | -- | 1993 | -- | 53.2 | 54.8 | 93.1 | -- | 2507846 |
| NBI report | IR71 | IR71 RAMP TO IR670 | 0.16 MI S OF 5TH AVE | Steel Stringer/Multi-beam or girder | -- | 1993 | -- | 110.9 | 121.1 | 81.0 | FO | 2507854 |
| NBI report | VANELM STREET | DITCH N/NEWELL DR | 500 FT N/NEWELL DRIVE | Concrete Culvert | -- | 1993 | -- | 24.9 | 27.9 | 100.0 | -- | 2562685 |
| NBI report | CAMPUS VIEW BLVD | CONRAIL E/HIGH STREET | 3100 FT E/HIGH STREET | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1994 | -- | 95.1 | 304.1 | 74.9 | -- | 2560119 |
| NBI report | SR 104 | MARSH RUN | 1.05 MI. N. OF SR 270 | Concrete Culvert | -- | 1994 | -- | 24.0 | 25.9 | 97.2 | -- | 2508656 |
| NBI report | WILSON RD | BARBIE DITCH (WILSON) | 0.3 MI NORTH OF TRABUE RD | Concrete Frame | -- | 1994 | 2008 | 29.2 | 31.8 | 92.1 | -- | 2535483 |
| NBI report | I-670 | OVER ST CLAIR AVE | EAST OF IR71 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1994 | -- | 76.1 | 187.0 | 79.3 | -- | 2517558 |
| NBI report | IR-670 | OVER NS RR | IR-670 WB TO IR-71NB RAMP | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1994 | -- | 145.0 | 342.5 | 58.2 | -- | 2506505 |
| NBI report | FISHER ROAD | CONRAIL W/I270 | .66 MI W/I-270 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1994 | -- | 67.9 | 181.1 | 89.4 | -- | 2560240 |
| NBI report | INTERSTATE 670 | RAMP OVER SECOND AVE | RAMP-IR670 WB TO IR71NB | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1994 | -- | 55.1 | 139.8 | 42.8 | FO | 2506467 |
| NBI report | IR 670 | OVER LEONARD AVE | .41 E.OF SR3(CLEVELAND AV | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1994 | -- | 75.1 | 186.4 | 75.5 | -- | 2506491 |
| NBI report | RAMP F:670W TO 71S | RAMP F OVER 670W/UNDER 7 | RAMP F: 670W TO 71S | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1995 | -- | 123.0 | 443.6 | 77.0 | -- | 2506432 |
| NBI report | IR270 | SB CD ROAD OVER RAMP D | 01.60 MI S.OF SR161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1995 | -- | 146.0 | 252.0 | 76.0 | FO | 2512173 |
| NBI report | IR-71 | RAMPC OVER I-670,RAMPS&R | 0.22 N OF I-670EB | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1995 | -- | 111.9 | 638.8 | 82.9 | -- | 2507781 |
| NBI report | IR270 | NB CD ROAD OVER MORSE | 01.72 MI S.OF SR161 | Steel Stringer/Multi-beam or girder | -- | 1995 | -- | 159.1 | 163.4 | 80.0 | -- | 2512203 |
| NBI report | PEDESTRIAN WALKWAY | RMEL MALL (U) PED WALKWA | 42FT E/DAVIS AVENUE | Steel Frame | -- | 1995 | -- | 61.0 | 75.1 | 0.0 | -- | 2562812 |
| NBI report | LITTLE TURTLE WAY | SR 161 | 1.73 MI E OF IR 270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1995 | -- | 91.9 | 190.6 | 84.0 | -- | 2509229 |
| NBI report | WATKINS RD | MILL RACE (WATKINS) | 0.1 MI EAST OF SPANGLER | Concrete Frame | -- | 1995 | -- | 24.0 | 25.9 | 93.4 | -- | 2535580 |
| NBI report | WATKINS RD | ALUM CREEK (WATKINS) | 0.15 MI EAST OF SPANGLER | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1995 | -- | 48.9 | 130.9 | 93.4 | -- | 2535599 |
| NBI report | OVERBROOK DRIVE | ROOK DRIVE (O) ADENABROO | .19MI E/HIGH STREET | Concrete Culvert | -- | 1995 | -- | 24.0 | 33.1 | 100.0 | -- | 2560445 |
| NBI report | CR 189 (ULRY RD) | SR 161 | 2.29 MI E OF IR 270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1995 | -- | 107.0 | 212.0 | 92.0 | -- | 2509237 |
| NBI report | CR 111 (HARLEM RD) | SR 161 | 4.08 MI E OF IR 270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1995 | -- | 100.1 | 206.4 | 97.6 | -- | 2509318 |
| NBI report | SR 161 | OVER ROCKY FORK CREEK | 3.49 MI E OF IR 270 | Concrete Slab (3 spans) | -- | 1996 | -- | 35.1 | 93.5 | 85.0 | -- | 2509288 |
| NBI report | SR 161 | OVER CR-103(HAMILTON RD) | 3.04 MI E OF IR 270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1996 | -- | 110.9 | 191.0 | 85.0 | -- | 2509261 |
| NBI report | SR 161 | OVER CR-103(HAMILTON RD) | 3.04 MI E OF IR 270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1996 | -- | 110.9 | 191.0 | 85.0 | -- | 2509253 |
| NBI report | SR 161 | SUGAR RUN | 4.51 MI E OF IR 270 | Concrete Culvert (2 spans) | -- | 1996 | -- | 15.7 | 35.4 | 70.0 | -- | 2509326 |
| NBI report | SR 161 | OVER ROCKY FORK CREEK | 3.49 MI E OF IR 270 | Concrete Slab (3 spans) | -- | 1996 | -- | 35.1 | 93.5 | 85.0 | -- | 2509296 |
| NBI report | NEW ALBANY RD | OVER SR161 | 1.35 MI WEST OF US62 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1996 | -- | 95.1 | 194.9 | 95.0 | FO | 2509369 |
| NBI report | SR315 NB RAMP | RAMP: GOODALE TO 315N | GOODALE TO 315NB RAMP | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1997 | -- | 87.6 | 177.2 | 81.0 | FO | 2515229 |
| NBI report | IR 270 | NB CD ROAD OVER RAMP B | 01.86 MI S.OF SR161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1997 | -- | 127.0 | 229.0 | 80.0 | -- | 2512254 |
| NBI report | GOODALE AVE | GOODALE O SR315 & OLENT | .1 MI NORTH OF RR BRIDGE | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1997 | -- | 92.9 | 608.3 | 63.7 | FO | 2515296 |
| NBI report | IR270 | SB CD ROAD OVER MORSE | 01.74 MI S.OF SR161 | Steel Stringer/Multi-beam or girder | -- | 1997 | -- | 159.1 | 163.4 | 80.0 | -- | 2512238 |
| NBI report | RAMPS TO 315 | 315 RAMPS OVER OLENTANGY | .16 MI NORTH OF GOODALE | Concrete Tee beam (5 spans) | -- | 1997 | -- | 164.1 | 756.6 | 85.0 | -- | 2515253 |
| NBI report | WAGGONER RD | DYSART DITCH (WAGGONER) | 0.3 MI NORTH OF BROAD ST | Concrete Culvert | -- | 1997 | -- | 29.9 | 30.8 | 99.4 | -- | 2535807 |
| NBI report | SR315 TO 670EB | OVER FRA-315-0216 | .11 MI NORTH OF GOODALE | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1997 | -- | 143.1 | 794.7 | 81.0 | FO | 2515237 |
| NBI report | IR270 | SB CD ROAD OVER RAMP C | 01.84 MI S.OF SR161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1997 | -- | 172.9 | 304.1 | 76.0 | FO | 2512262 |
| NBI report | IR270 | NB CD ROAD OVER RAMP A | 01.60 MI S.OF SR161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1997 | -- | 151.9 | 274.0 | 76.0 | FO | 2512165 |
| NBI report | BEAUREGARD BLVD | EGARD (0) STREAM BIG RUN | 385' S/CROCKER RUN ROAD | Prestressed Culvert | -- | 1997 | -- | 16.1 | 80.1 | 100.0 | -- | 2563320 |
| NBI report | MANLEY WAY | Y WAY (0) BIG RUN | 182 FT S/CROCK RUN ROAD | Prestressed Culvert | -- | 1997 | -- | 16.1 | 89.9 | 100.0 | -- | 2563312 |
| NBI report | MORSE RD | ALUM CREEK (MORSE) | 0.1 MI WEST OF SUNBURY RD | Concrete Slab (3 spans) | -- | 1997 | -- | 58.1 | 151.9 | 84.2 | -- | 2535874 |
| NBI report | THIRD AVE | OLENTANGY RIVER (THIRD) | .15 MI E. OF OLENT.RV.RD | Concrete Girder and floorbeam system (2 spans) | -- | 1997 | -- | 134.8 | 275.9 | 79.1 | FO | 2535742 |
| NBI report | MCCUTHEON ROAD | IR270 | 03.43 MI S.OF SR161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1997 | -- | 143.1 | 275.9 | 72.0 | -- | 2512025 |
| NBI report | EASTON WAY | IR270 | 02.38 MI S.OF SR161 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1997 | -- | 105.0 | 363.5 | 99.0 | -- | 2512041 |
| NBI report | IR270 | OVER SUNBURY ROAD | 0.890MI S. OF SR161 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1997 | -- | 106.3 | 190.3 | 80.0 | -- | 2511932 |
| NBI report | HAYDEN RUN RD | HAYDEN RUN (HAYDEN RUN) | 0.2 MI WEST OF DUBLIN RD | Concrete Culvert | -- | 1998 | -- | 36.1 | 46.9 | 99.1 | -- | 2535777 |
| NBI report | HAYDEN RUN RD | HAYDEN RUN(HAYDEN RUN RD | 0.5 MI WEST OF DUBLIN RD | Concrete Culvert | -- | 1998 | -- | 36.1 | 52.2 | 98.2 | -- | 2535769 |
| NBI report | INDIANOLA AVENUE | NOLA AVE (O) IUKA AVENUE | 100FT N/WOODRUFF AVENUE | Concrete Arch - Deck | -- | 1998 | -- | 58.1 | 86.0 | 76.0 | FO | 2560992 |
| NBI report | 315 C | OVER RMP NA 315S-NEIL AV | GOODALE ST. OVR RAMP NA | Steel Stringer/Multi-beam or girder | -- | 1998 | 2004 | 83.3 | 83.3 | 83.8 | -- | 2506254 |
| NBI report | FORESTWIND DRIVE | TWIN DR (0) BIG RUN | 900' S/ALKIRE ROAD | Prestressed Culvert | -- | 1998 | -- | 12.1 | 120.1 | 100.0 | -- | 2563339 |
| NBI report | I-270 SB | OVER CR-17 (MORSE ROAD) | 1.75 MI S OF SR-161 | Steel Stringer/Multi-beam or girder | -- | 1998 | -- | 158.5 | 162.7 | 86.3 | FO | 2512297 |
| NBI report | I-270 NB | OVER CR-17 (MORSE ROAD) | 1.75 MI S OF SR-161 | Steel Stringer/Multi-beam or girder | -- | 1998 | -- | 158.5 | 162.7 | 86.3 | FO | 2512289 |
| NBI report | FODOR ROAD | RD OVER SUGAR RUN | 465FT W/HEATHGATE DRIVE | Concrete Culvert | -- | 1998 | -- | 32.2 | 47.9 | 100.0 | -- | 2563630 |
| NBI report | WINCHESTER CROSSIN | ESTER CROSSING BLVD.CREE | 1597FT E/GENDER ROAD | Prestressed Culvert (3 spans) | -- | 1999 | -- | 24.0 | 48.9 | 94.1 | -- | 2563363 |
| NBI report | KING AVE | OLENT RIVER (KING AVE) | 304' E. OF OLEN. RIV. RD | Prestressed Arch - Deck (5 spans) | -- | 1999 | -- | 91.9 | 394.0 | 98.3 | -- | 2535734 |
| NBI report | IR 270 | OVER RAMP TO 270WB "O" | .16 MI E OF IR71 | Concrete Slab (3 spans) | -- | 1999 | -- | 52.5 | 132.9 | 80.7 | FO | 2511533 |
| NBI report | SR315 | OVER 62D(TOWN ST) | .08 MI NORTH OF RICH ST. | Concrete Slab (3 spans) | -- | 1999 | -- | 55.1 | 144.4 | 87.9 | FO | 2515016 |
| NBI report | I270 | OVER RAMP 270WB TO 71SB | .13 MI. W. OF IR71 | Concrete Slab (3 spans) | -- | 1999 | -- | 52.5 | 138.1 | 81.0 | FO | 2511320 |
| NBI report | SR 315 | OVER 62(RICH ST) | BTWN TOWN & SULLIVANT AVE | Concrete Slab (3 spans) | -- | 1999 | -- | 55.1 | 144.4 | 88.6 | FO | 2514982 |
| NBI report | IR 270 | OVER IR 71 | 2.88 MI W OF SR3 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1999 | -- | 105.6 | 317.9 | 80.7 | FO | 2511444 |
| NBI report | SR315 | OVER SULLIVANT AVE | .10 MI S OF RICH ST | Concrete Slab (3 spans) | -- | 1999 | -- | 55.1 | 144.4 | 87.8 | FO | 2514923 |
| NBI report | US 40 | ALUM CREEK | OVER ALUM CREEK | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1999 | -- | 76.1 | 203.1 | 75.0 | FO | 2502712 |
| NBI report | I-270 | OVER SMOKY ROW RD | 0.89 MI N OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 2000 | -- | 70.5 | 149.9 | 74.5 | FO | 2510634 |
| NBI report | NEW ALBANY RD EAST | ALBANY RD E (O) SUGAR RU | 758 FT S/CENTRAL COLLEGE | Concrete Culvert | -- | 2000 | -- | 32.2 | 170.0 | 100.0 | -- | 2563649 |
| NBI report | CITY GATE DRIVE | GATE DRIVE (0) STREAM | 1871 FT W/STELZER ROAD | Concrete Culvert | -- | 2000 | -- | 14.1 | 54.1 | 100.0 | -- | 2563290 |
| NBI report | AIRCENTER DRIVE | NTER DRIVE (0) STREAM | 1645 FT E/STELZER ROAD | Prestressed Culvert | -- | 2000 | -- | 14.1 | 69.9 | 100.0 | -- | 2563282 |
| NBI report | PEDESTRIAN WALKWAY | AL (U) PEDWK | 221 FT E/FIFTH STREET | Steel Stringer/Multi-beam or girder | -- | 2000 | -- | 34.1 | 34.1 | 0.0 | -- | 2563347 |
| NBI report | SAWMIL OVER 270 | SAWMILL OVER I-270 | 1 MI E OF SR 257 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2000 | -- | 82.7 | 169.6 | 99.0 | -- | 2510553 |
| NBI report | I-270 | OVER SMOKY ROW RD | 3.89 MI N OF US33 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 2000 | -- | 70.5 | 149.9 | 81.4 | FO | 2510618 |
| NBI report | CHAPEL STONE ROAD | L STONE(0) DYSAR CREEK | 355'R/RIVER PEBBLE DR. | Prestressed Culvert | -- | 2000 | -- | 20.0 | 60.0 | 100.0 | -- | 2563274 |
| NBI report | ARBOR ROSE WAY | ROSE WAY (0) DYSAR CREEK | 365 FT E/RIVER PEBBLE DR | Prestressed Culvert | -- | 2000 | -- | 20.0 | 68.9 | 100.0 | -- | 2563266 |
| NBI report | I-670 | OVER US33 & SCIOTO R. | COLUMBUS | Steel Stringer/Multi-beam or girder (6 spans) | -- | 2000 | -- | 99.1 | 579.1 | 61.2 | FO | 2505819 |
| NBI report | MCKINLEY AVENUE | LEY (O) DRY RUN | 875 FT W/GRANDVIEW BLVD. | Prestressed Culvert | -- | 2000 | -- | 22.0 | 71.9 | 98.8 | -- | 2563061 |
| NBI report | 670E TO 315N RAMP | RAMP SI 670E-315N OVR 31 | COLUMBUS | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2000 | -- | 112.9 | 202.8 | 78.7 | -- | 2505959 |
| NBI report | CSX RR | UNDER CSX RR | SOUTH OF GOODALE ST | Steel Stringer/Multi-beam or girder | -- | 2000 | -- | 97.1 | 167.0 | 0.0 | -- | 2515164 |
| NBI report | 670W TO 315S RAMP | 670W TO 315S OVR OLENTAN | COLUMBUS | Steel Stringer/Multi-beam or girder (8 spans) | -- | 2000 | -- | 121.4 | 832.4 | 85.0 | -- | 2505983 |
| NBI report | 315N TO 670E RAMP | SR-315N-670E OVR OLENTAN | COLUMBUS | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2000 | -- | 107.0 | 388.8 | 85.0 | -- | 2515105 |
| NBI report | I-670 | SR 315 / OLENTANGY R. | COLUMBUS | Steel Stringer/Multi-beam or girder (7 spans) | -- | 2000 | -- | 107.9 | 687.7 | 61.2 | FO | 2505924 |
| NBI report | CONRIAL RR | UNDER NS RR | SOUTH OF GOODALE ST | Steel Stringer/Multi-beam or girder | -- | 2000 | -- | 78.7 | 146.3 | 0.0 | -- | 2515172 |
| NBI report | SOUDER AVENUE | R (O) SCIOTO RIVER | 478FT N/MCKINLEY AVENUE | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2001 | -- | 141.1 | 412.1 | 77.7 | -- | 2563010 |
| NBI report | PEDESTRIAN WALKWAY | AEP PED WALKWAY OV SPRIN | 0.47 MI W OF N FOURTH ST | Steel Frame | -- | 2001 | -- | 77.1 | 80.7 | 0.0 | -- | 2502305 |
| NBI report | SR315 RAMP S-K | OVER US-33 | 1.34 MI. N. OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2001 | -- | 80.4 | 252.6 | 90.0 | -- | 2501392 |
| NBI report | UNDER SR710SCHROCK | OVER I-71 | 2 MI S. OF IR 270 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2001 | -- | 136.2 | 273.6 | 92.4 | -- | 2508249 |
| NBI report | PEDESTRIAN WALKWAY | G STREET (U) PED WALK | 203 FT W/MARCONI BLVD | Steel Truss - Thru | -- | 2001 | -- | 79.1 | 80.1 | 0.0 | -- | 2563231 |
| NBI report | CONRAIL RR | CONRAIL S/VINE STREET | 555FT SIVINE STREET | Steel Girder and floorbeam system | -- | 2001 | -- | 111.9 | 122.1 | 0.0 | -- | 2563681 |
| NBI report | AIRPORT TAXIWAY | SAWYER RD | 1.2 MI W HAMILTON RD | Steel Arch - Deck | -- | 2001 | -- | 34.1 | 34.1 | 0.0 | -- | 2565285 |
| NBI report | EDWARDS FARMS ROAD | DS FARMS RD(0) HAYDEN RU | 83 FT S/HAYDEN RUN ROAD | Prestressed Culvert (2 spans) | -- | 2001 | -- | 24.0 | 47.9 | 94.1 | -- | 2562340 |
| NBI report | UNDER CSX RR | UNDER NS RR | .61 MI N OF IR70 | Steel Girder and floorbeam system | -- | 2001 | -- | 73.5 | 130.6 | 0.0 | -- | 2514990 |
| NBI report | SR 315 | SCIOTO R./RICKENBACKER D | 100 YARDS SOF US 33 | Prestressed Box beam or girders - Multiple (4 spans) | -- | 2001 | -- | 107.9 | 397.3 | 80.0 | -- | 2515075 |
| NBI report | SR 315 | OVER US-33 | 1.34 MI. N. OF I-70 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2001 | -- | 74.5 | 233.6 | 81.0 | -- | 2501414 |
| NBI report | MEIJER DRIVE | R DRIVE (0) STREAM | 60FT N/EAST BROAD STREET | Prestressed Culvert | -- | 2002 | -- | 24.9 | 27.9 | 100.0 | -- | 2562758 |
| NBI report | I-670 | 670 OVER SCIOTO OVERFLOW | 0.1 MI EAST OF GRANDVIEW | Steel Stringer/Multi-beam or girder (3 spans) | -- | 2002 | -- | 46.9 | 126.6 | 85.0 | -- | 2505789 |
| NBI report | 670EB RAMP TO US33 | 670 RAMP SE OVER SCIOTO | IR670EB RAMP TO USR33 | Steel Stringer/Multi-beam or girder (5 spans) | -- | 2002 | -- | 96.5 | 449.2 | 54.3 | -- | 2505878 |
| NBI report | CHATTERTON ROAD | ERTON RD (0) STREAM | 204 FT W/BRICE ROAD | Prestressed Box beam or girders - Multiple | -- | 2002 | -- | 83.0 | 83.0 | 94.1 | -- | 2563371 |
| NBI report | I670 RAMP SC | 670 RAMP SC OVER SCIOTO | US33 TO I-670 WB RAMP | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2002 | -- | 109.9 | 390.1 | 84.0 | -- | 2505843 |
| NBI report | 670 RAMP SA | 670 RAMP C OVER SCIOTO R | EAST OF GRANDVIEW AVE | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 2002 | -- | 108.9 | 438.7 | 46.2 | -- | 2505746 |
| NBI report | 670 M.L. EB WB | 670 M.L.OVER SCIOTO RIVE | EAST OF GRANDVIEW AVE | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2002 | -- | 108.9 | 328.8 | 66.0 | -- | 2505762 |
| NBI report | I-670 RAMP SB | 670 RAMP B OVER SCIOTO R | EAST OF GRANDIEW AVE | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2002 | -- | 113.9 | 335.6 | 84.0 | -- | 2505770 |
| NBI report | I-670 EB/WB | OVER N. FOURTH ST. (US23 | .07 MI EAST OF THIRD ST | Prestressed Box beam or girders - Multiple (3 spans) | -- | 2003 | -- | 55.1 | 144.7 | 81.0 | -- | 2506289 |
| NBI report Bridgehunter | LANE AVENUE | OLENTANGY (LANE AVE) | SOUTH OF OLENTANGY RIV.RD | Concrete Stayed girder (2 spans) | -- | 2003 | -- | 184.1 | 370.1 | 91.5 | -- | 2531399 |
| NBI report | HIGH STREET | OVER I-670 | .19 MI WEST OF THIRD ST | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2003 | -- | 102.7 | 208.0 | 92.0 | -- | 2506238 |
| NBI report | FRONT/PARK/GOODALE | OVER I-670 | .38 MI WEST OF HIGH ST | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2003 | -- | 86.0 | 170.0 | 92.0 | -- | 2506165 |
| NBI report | WEST HIGH ST CAP | UNDER WEST HIGH ST CAP | WEST OF HIGH ST. | Steel Stringer/Multi-beam or girder | -- | 2003 | -- | 100.1 | 194.9 | 0.0 | -- | 2506386 |
| NBI report | EAST HIGH ST CAP | UNDER EAST HIGH ST CAP | EAST OF HIGH ST | Steel Stringer/Multi-beam or girder | -- | 2003 | -- | 105.0 | 209.3 | 0.0 | -- | 2506351 |
| NBI report | THIRD ST (US23) | OVER I-670 | .19 MI EAST OF HIGH ST | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2003 | -- | 87.6 | 293.6 | 81.0 | -- | 2500914 |
| NBI report | I-270 | OVER DRAINAGE DITCH | WEST OF BRICE ROAD | Concrete Culvert (2 spans) | -- | 2003 | -- | 22.0 | 22.0 | 70.0 | -- | 2505681 |
| NBI report | SUSSEX PLACE | X PLACE DR (O) MARSH RUN | 540 FT SIDYER ROAD | Concrete Culvert | -- | 2004 | -- | 7.9 | 71.9 | 100.0 | -- | 2563819 |
| NBI report | DEMPSEY ROAD-C183 | OVER 270 | NORTH OF 161 | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2004 | -- | 127.3 | 256.6 | 95.0 | -- | 2511894 |
| NBI report | RAMP NC | RMP NC O GOODALE CONN&RM | OVER GOODALE CONNECTOR | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 2004 | -- | 119.4 | 358.9 | 91.9 | -- | 2517612 |
| NBI report | MICH. AVE CONNECT | MICH CONN OVER I670 RAMP | MICHIGAN AVE OVER NK/NB | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2004 | -- | 73.5 | 150.3 | 73.4 | -- | 2515504 |
| NBI report | I-670 ML | OVER GOODALE CONN & RAMP | 670 OVER GOODALE CONNECT | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 2004 | -- | 122.7 | 426.2 | 81.0 | -- | 2517647 |
| NBI report | RAMP B OF 315 | RAMP B OVER OLENTANGY R. | RAMP B OVER OLENTANGY | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2004 | -- | 71.5 | 264.8 | 94.6 | -- | 2515431 |
| NBI report | OVERBROOK DRIVE | ROOK DRIVE(O)ADENA BROOK | .34MI W/INDIANOLA AVENUE | Concrete Culvert | -- | 2004 | -- | 21.0 | 56.1 | 100.0 | -- | 2561921 |
| NBI report | I-670 ML | OVER CSX RR | OVER CSX RR | Steel Stringer/Multi-beam or girder (7 spans) | -- | 2004 | -- | 101.1 | 586.0 | 79.2 | -- | 2517574 |
| NBI report | RAMP A | RAMP A OVER OLENTANGY R. | RAMP A OVER OLENTANGY | Steel Stringer/Multi-beam or girder (7 spans) | -- | 2004 | -- | 71.9 | 460.0 | 95.3 | -- | 2515415 |
| NBI report | I-670 RAMP ND | RAMP ND O RAMPS/GOODALE | O GOODALE CONNECTOR | Prestressed Stringer/Multi-beam or girder (8 spans) | -- | 2004 | -- | 77.4 | 529.2 | 91.5 | -- | 2517590 |
| NBI report | I-670 ML | OVER NEIL AVE. | OVER NEIL AVE. | Steel Stringer/Multi-beam or girder | -- | 2004 | -- | 123.0 | 123.0 | 79.0 | -- | 2517639 |
| NBI report | RAMP F:270S-161E | RMP 270SB-161EB O 270&RM | S70 S TO 161 E | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2005 | -- | 171.3 | 625.0 | 82.0 | -- | 2516616 |
| NBI report | CSX RAILROAD | ROAD (U) CSX RAILROAD | 2478FT E/SMOKY ROW ROAD | Steel Girder and floorbeam system | -- | 2005 | -- | 44.0 | 97.1 | 0.0 | -- | 2561700 |
| NBI report | PARK ROAD (CR-19) | OVER I-71 | 1ST OVHD SOUTH OF POLARIS | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2005 | -- | 125.7 | 241.2 | 99.0 | -- | 2508354 |
| NBI report | BROUGHTON AVE | HTON AVENUE (0) DITCH | 100 FT W/MCCORMICK BLVD | Concrete Culvert | -- | 2006 | -- | 27.9 | 78.1 | 94.1 | -- | 2563096 |
| NBI report | GEMINI PKWY | OVER 1-71 | 0.5 MI NORTH OF POLARIS | Steel Stringer/Multi-beam or girder (2 spans) | -- | 2006 | -- | 103.0 | 190.0 | 98.0 | -- | 2102293 |
| NBI report | WB SR161 | BIG WALNUT CREEK | EAST OF SUNBURY RD. | Steel Stringer/Multi-beam or girder (3 spans) | -- | 2006 | -- | 113.9 | 301.9 | 85.6 | -- | 2509539 |
| NBI report | EB SR161 | BIG WALNUT CREEK | 0.21 MI E OF SUNBURY RD. | Steel Stringer/Multi-beam or girder (3 spans) | -- | 2006 | -- | 114.2 | 305.1 | 88.8 | -- | 2509520 |
| NBI report | RAMP (270EB-71NB) | RAMP (270EB-71NB) OVER 7 | RAMP OV I-71 COLS NORTH | Steel Stringer/Multi-beam or girder (5 spans) | -- | 2007 | -- | 161.4 | 630.6 | 88.9 | -- | 2511452 |
| NBI report | OVERBROOK DRIVE | ROOK NO#4 (O) ADENA | 985 FT SOUTH OF COOKE RD | Concrete Culvert | -- | 2007 | -- | 24.0 | 32.2 | 100.0 | -- | 2561174 |
| NBI report | US-23 | CSX & NS RAILROAD | 0.36 MI. N. OF SR-104 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2007 | -- | 91.5 | 286.4 | 74.1 | -- | 2500612 |
| NBI report | RAMP FROM SR-161WB | RAMP FR LTW OVER SR-161W | 0.69 MI. E OF SUNBURY RD. | Steel Stringer/Multi-beam or girder (4 spans) | -- | 2007 | -- | 211.0 | 774.0 | 93.8 | -- | 2509598 |
| NBI report | TAXIWAY H | INT GATEWAY | 1 MILE E OF STELZER RD. | Concrete Girder and floorbeam system | -- | 2008 | -- | 186.0 | 191.0 | 100.0 | -- | 2564661 |
| NBI report | FUT TERMINAL ACCES | INT GATEWAY | 1.5 MI E OF STELZER RD. | Concrete Girder and floorbeam system | -- | 2008 | -- | 187.0 | 191.9 | 96.0 | -- | 2564610 |
| NBI report | PERIMETER RD | INT GATEWAY | 1 MI E OF STELZER RD | Concrete Girder and floorbeam system | -- | 2008 | -- | 189.0 | 194.9 | 100.0 | -- | 2564734 |
| NBI report | RAMP FROM AIRPORT | RAMP G1 FROM STELZER RD. | 0.04 MI W OF STELZER RD. | Steel Stringer/Multi-beam or girder | -- | 2009 | -- | 149.3 | 168.6 | 97.8 | -- | 2518066 |
| NBI report | I-670WB FR AIRPORT | OVER STELZER ROAD | AT AIRPORT ENTRANCE | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 2009 | -- | 67.9 | 139.1 | 86.0 | -- | 2518074 |
| NBI report | I-670 TO AIRPORT | OVER STELZER ROAD | AT AIRPORT ENTRANCE | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 2009 | -- | 67.9 | 139.1 | 89.8 | -- | 2518082 |