Catano

CarriesCrossesLocationDesignStatusYear BuiltYear ReconSpan LengthTotal LengthSRSD/FOID
NBI reportPR 5BUCHANNAN CHANNEL3.5 KM SOUTH OF CATANOPrestressed Box beam or girders - Multiple--1943--60.065.695.0--026731
NBI reportPR 888CHANNEL1 KM NORTH OF CATA¥OConcrete Slab (3 spans)--1943--16.748.226.0SD003711
NBI reportPR 165AGUAS FRIAS CHANNEL4 KM WEST OF CATA&OConcrete Box beam or girders - Multiple (6 spans)--1957197443.3240.566.9FO007601
NBI reportPR 22MALARIA CREEK3 KM E INT PR 22 & PR 167Concrete Slab (4 spans)--1971--34.8129.673.0--011781
NBI reportPR 22OIL PIPE LINES1.1 KM E INT PR22 & PR167Concrete Slab--1971--40.744.684.7--011791
NBI reportPR 22DRAINAGE DITCH1 KM EAST FROM INT PR 167Concrete Slab (3 spans)--1971--35.893.884.0--011801
NBI reportPR 22PR 53.2 KM S W OF CATA¥OConcrete Slab (4 spans)--1971--48.2173.287.0--011821
NBI reportRAMP PR 22 TO PR 5PR 53.2 KM S W OF CATA¥OSteel Stringer/Multi-beam or girder (3 spans)--1971--86.3194.259.4FO011831
NBI reportPR 165PR 5IN THE TOWN OF CATA¥OPrestressed Stringer/Multi-beam or girder (16 spans)--1972--82.41133.983.0--011361