Toa Baja

CarriesCrossesLocationDesignStatusYear BuiltYear ReconSpan LengthTotal LengthSRSD/FOID
NBI reportJOSE DE DIEGO ST.LEVITTOWN CHANNEL5 KM WEST OF CATANOConcrete Culvert (2 spans)--1960--10.221.366.3FO021081
NBI reportCORUJO COLLECTORHONDO RIVEROFF PR 866Steel Culvert--1967--38.138.192.7FO026991
NBI reportLOS DOMINICOS AVE.LEVITTOWN CHANNEL5.6 KM WEST OF CATANOSteel Stringer/Multi-beam or girder (3 spans)--1972--56.4146.047.6FO021102
NBI reportLOS DOMINICOS AVE.LEVITTOWN CHANNEL5.6 KM WEST OF CATA¥OSteel Stringer/Multi-beam or girder (3 spans)--1972--56.4146.047.5FO021112
NBI reportCONCHA CAMARON ST.CHANNELLEVITTOWNPrestressed Stringer/Multi-beam or girder (3 spans)--1973--73.2217.575.8FO021191
NBI reportPR 22LOCAL ROAD9.8 KM S E OF TOA BAJAPrestressed Stringer/Multi-beam or girder--1981--111.2114.593.0--017271
NBI reportPR 22 EASTBOUNDLA PLATA RIVER & PR 6932.8 KM SOUTH OF TOA BAJAPrestressed Stringer/Multi-beam or girder (37 spans)--1990--121.74199.098.2--019522
NBI reportPR 22 WESTBOUNDLA PLATA RIVER & PR 6932.8 KM SOUTH OF TOA BAJAPrestressed Stringer/Multi-beam or girder (37 spans)--1990--116.84240.098.2--018472
NBI reportMETRO URBANO ROADPR 225.39km SE DORADOPrestressed Stringer/Multi-beam or girder--2013--115.5118.4100.0--029791