Hopewell

CarriesCrossesLocationDesignStatusYear BuiltYear ReconSpan LengthTotal LengthSRSD/FOID
NBI report6TH AVENUENS RAILWAY0010LAPRADE A00107TH AVESteel Stringer/Multi-beam or girder (3 spans)--1985--118.1232.081.2--000000000020471
NBI reportEBL ROUTE 0295ROUTE 363.52Fr ChestCo&3.4 To 106Steel Stringer/Multi-beam or girder (2 spans)--1991--106.0212.094.9--000000000023271
NBI reportEBL ROUTE 0295WESTERN ST & NS RWY3.35 MI. FR. CHESTFLD. COSteel Stringer/Multi-beam or girder (2 spans)--1991--100.1191.993.9--000000000023279
NBI reportROUTE 0295 RAMP AWESTERN ST & NS RWY0.20 MI. FR. RTE. 36 WBLSteel Stringer/Multi-beam or girder (2 spans)--1991--99.1200.196.8--000000000023283
NBI reportROUTE 0295 RAMP DWESTERN ST & NS RWY0.20 MI. FR. I-295 EBLSteel Stringer/Multi-beam or girder (2 spans)--1991--109.9213.994.5--000000000023281
NBI reportWBL ROUTE 0295ROUTE 363.52Fr Chest Co&3.4To106Steel Stringer/Multi-beam or girder (2 spans)--1991--106.0212.094.9--000000000023277
NBI reportWBL ROUTE 0295WESTERN ST & NS RWY3.35 MI. FR. CHESTFLD. COSteel Stringer/Multi-beam or girder (2 spans)--1991--100.1191.993.9--000000000023278
NBI reportWESTERN ST. & NSRRCABIN CREEK0.40 Fr 36 &0.29 To WLAveConcrete Culvert (4 spans)--1991--9.854.196.7--000000000023291
NBI reportRIVER ROADCABIN CREEK.50 WCL HOPEW .51 MESA DRConcrete Arch - Deck--2007--24.024.097.0--000000000027108